Demolition Safety Checklist
Complete this comprehensive demolition safety inspection before and during demolition operations to ensure OSHA 1926 Subpart T compliance and protect workers from structural collapse, falling debris, and hazardous material exposure.
- Industry: Construction
- Frequency: Before each demolition phase
- Estimated Time: 45-60 min
- Role: Demolition Supervisor / Safety Manager
- Total Items: 54
- Compliance: OSHA 1926.850-860, OSHA 1926.62 Lead, OSHA 1926.1101 Asbestos, EPA NESHAP, UK HSE CDM 2015
Engineering Survey (OSHA 1926.850)
Verify engineering survey completion per OSHA requirements.
- Written engineering survey completed by competent person?
- Structural condition of building documented?
- Type of framing identified (wood, steel, masonry, concrete)?
- Previous building use investigated for hazards?
- Adjacent structures assessed for stability impact?
- Engineering survey available on-site?
Utility Disconnection & Isolation
Verify all utilities properly disconnected and locked out.
- Electrical service disconnected at source?
- Gas service disconnected and capped?
- Water service disconnected?
- Sewer lines capped/plugged?
- Steam lines disconnected (if applicable)?
- Telecommunications/cable disconnected?
- Written utility disconnection confirmations on file?
- Lockout/tagout procedures in place?
Hazardous Materials Assessment
Verify hazardous materials survey and abatement.
- Asbestos survey completed by licensed inspector?
- All ACM (asbestos-containing materials) identified and labeled?
- ACM properly abated before demolition?
- Lead paint survey completed?
- Lead-based paint properly managed/abated?
- PCBs in transformers/ballasts assessed?
- Mold contamination assessed?
- Mercury-containing devices removed (thermostats, switches)?
- Hazmat clearance documentation on file?
Site Preparation & Perimeter Security
Verify site is properly prepared and secured.
- Perimeter fencing installed (minimum 6 ft)?
- Warning signs posted at all access points?
- Pedestrian walkways protected (sidewalk sheds)?
- Traffic control plan implemented?
- Dust control measures in place?
- Noise mitigation measures for residential areas?
- Debris chutes installed for upper floors?
- Exclusion zones clearly marked?
Structural Demolition Controls
Verify structural demolition procedures.
- Demolition sequence plan documented?
- Top-down demolition sequence followed?
- Shoring/bracing installed where required?
- Floor openings covered or barricaded?
- Wall sections braced to prevent uncontrolled collapse?
- No undermining of walls or floors?
- Floor load limits not exceeded by debris?
- Mechanical equipment operated at safe distances?
Worker Protection & PPE
Verify worker safety measures.
- All workers wearing hard hats (Class E minimum)?
- Safety glasses/goggles worn?
- Hearing protection provided for high noise areas?
- Respiratory protection provided as needed?
- Fall protection for work above 6 feet?
- High-visibility vests worn?
- Steel-toe safety boots worn?
- Buddy system in place for hazardous areas?
Emergency Preparedness
Verify emergency response capabilities.
- Site-specific emergency plan posted?
- First aid kit stocked and accessible?
- Trained first aider on site?
- Fire extinguishers available and charged?
- Emergency contact numbers posted?
- Evacuation routes established and clear?
- Communication system for alerts in place?
Related Construction Checklists
- Confined Space Entry Safety Checklist
- Electrical Safety Inspection Checklist for Construction
- Rigging & Hoisting Safety Inspection Checklist
- Ptasp Safety Audit