Manufacturing Value Stream Map Assessment Checklist

Comprehensive value stream mapping assessment checklist for lean manufacturing.

  • Industry: Manufacturing
  • Frequency: Quarterly/Annually
  • Estimated Time: 60-120 minutes
  • Role: Lean Manager
  • Total Items: 23
  • Compliance: Lean Manufacturing, Toyota Production System

Current State

As-is mapping

  • Current state map completed?
  • Lead time calculated?
  • Process times documented?

Waste Identification

Seven wastes

  • Seven wastes identified?
  • Non-value-added time calculated?

Future State

To-be vision

  • Future state map developed?
  • Implementation plan created?

Machine Guarding

OSHA 1910 Subpart O

  • Machine guards in place?
  • E-stop buttons tested?
  • Safety interlocks functional?
  • Light curtains operational?

Chemical Safety

OSHA 1910.1200 HazCom

  • SDS sheets available?
  • Containers labeled?
  • Secondary containment?

Ergonomics

Ergonomic assessment

  • Workstation heights OK?
  • Lifting aids available?
  • Anti-fatigue mats present?

Quality Control

Product quality

  • Tools calibrated?
  • Defect rate acceptable?
  • First article approved?

Environmental Controls

Ventilation and monitoring

  • Ventilation operating?
  • Noise within limits?
  • Lighting adequate?

Related Manufacturing Checklists

Related Lean Manufacturing Checklists

Why Use This Manufacturing Value Stream Map Assessment Checklist?

This manufacturing value stream map assessment checklist helps manufacturing teams maintain compliance and operational excellence. Designed for lean manager professionals, this checklist covers 23 critical inspection points across 8 sections. Recommended frequency: quarterly/annually.

Ensures compliance with Lean Manufacturing, Toyota Production System. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Manufacturing Value Stream Map Assessment Checklist cover?

This checklist covers 23 inspection items across 8 sections: Current State, Waste Identification, Future State, Machine Guarding, Chemical Safety, Ergonomics, Quality Control, Environmental Controls. It is designed for manufacturing operations and compliance.

How often should this checklist be completed?

This checklist should be completed quarterly/annually. Each completion takes approximately 60-120 minutes.

Who should use this Manufacturing Value Stream Map Assessment Checklist?

This checklist is designed for Lean Manager professionals in the manufacturing industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists