Control Plan Review
Complete per schedule.
- Industry: Manufacturing
- Frequency: Annual / As needed
- Estimated Time: 1-2 hours
- Role: Quality Engineer
- Total Items: 30
- Compliance: IATF 16949
Review
Review control plan.
- Control plan at current revision?
- Matches current process?
- Controls adequate?
Pre-Shift Verification & Setup
Initial verification before operations begin
- Operator / Inspector Name
- Date
- Shift Number
- Production Line / Area
- Previous shift handover notes reviewed?
Safety Protocols & Compliance
Verify all safety measures are in place per OSHA standards
- LOTO procedures verified for all equipment?
- All machine guards in place and secured?
- Emergency stop buttons tested and functional?
- Required PPE worn by all operators?
- Safety signage visible and current?
Equipment & Operational Readiness
Verify equipment is calibrated and operational
- Equipment calibration current and documented?
- All gauges and instruments reading correctly?
- Lubrication schedule maintained?
- Any abnormal sounds, vibrations, or leaks?
Quality Control Standards
Verify product quality meets specifications
- Current specifications/work instructions available?
- First article inspection completed?
- Measurement tools calibrated and in tolerance?
- Reject/scrap rate within acceptable limits?
Housekeeping & Work Environment
Workplace cleanliness and environmental conditions
- 5S standards maintained (Sort, Set, Shine, Standardize, Sustain)?
- Spill containment and cleanup supplies available?
- Ventilation adequate in work area?
- Waste properly segregated and disposed?
Documentation & Records
Complete all required documentation and reporting
- Production logs updated with current data?
- Any non-conformances documented on NCR?
- Corrective actions identified and assigned?
- Supervisor Signature
- Additional Remarks
Related Manufacturing Checklists
- PPAP Submission Review
- FMEA Review
- Measurement System Analysis
- In-Process Quality Check
- Shift Start Production Readiness
- End of Shift Shutdown & Handover
- Line Clearance Verification
- WIP Management Check