Manufacturing Control Plan Audit Checklist

Comprehensive control plan implementation audit checklist.

  • Industry: Manufacturing
  • Frequency: Quarterly/Annually
  • Estimated Time: 30-60 minutes
  • Role: Quality Auditor
  • Total Items: 23
  • Compliance: AIAG APQP, IATF 16949

Documentation

Control plan

  • Control plan revision current?
  • Linked to current PFMEA?

Implementation

Shop floor

  • Controls implemented as specified?
  • Inspection frequencies followed?
  • Specified gages being used?

Reaction Plans

Out of control

  • Reaction plans defined?
  • Operators aware of reaction plans?

Machine Guarding

OSHA 1910 Subpart O

  • Machine guards in place?
  • E-stop buttons tested?
  • Safety interlocks functional?
  • Light curtains operational?

Chemical Safety

OSHA 1910.1200 HazCom

  • SDS sheets available?
  • Containers labeled?
  • Secondary containment?

Ergonomics

Ergonomic assessment

  • Workstation heights OK?
  • Lifting aids available?
  • Anti-fatigue mats present?

Quality Control

Product quality

  • Tools calibrated?
  • Defect rate acceptable?
  • First article approved?

Environmental Controls

Ventilation and monitoring

  • Ventilation operating?
  • Noise within limits?
  • Lighting adequate?

Related Manufacturing Checklists

Related Quality Management Checklists

Why Use This Manufacturing Control Plan Audit Checklist?

This manufacturing control plan audit checklist helps manufacturing teams maintain compliance and operational excellence. Designed for quality auditor professionals, this checklist covers 23 critical inspection points across 8 sections. Recommended frequency: quarterly/annually.

Ensures compliance with AIAG APQP, IATF 16949. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Manufacturing Control Plan Audit Checklist cover?

This checklist covers 23 inspection items across 8 sections: Documentation, Implementation, Reaction Plans, Machine Guarding, Chemical Safety, Ergonomics, Quality Control, Environmental Controls. It is designed for manufacturing operations and compliance.

How often should this checklist be completed?

This checklist should be completed quarterly/annually. Each completion takes approximately 30-60 minutes.

Who should use this Manufacturing Control Plan Audit Checklist?

This checklist is designed for Quality Auditor professionals in the manufacturing industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists