Manufacturing Gage R&R Study Checklist

Comprehensive Gage R&R measurement system analysis checklist.

  • Industry: Manufacturing
  • Frequency: Per gage/method
  • Estimated Time: 60-120 minutes
  • Role: Quality Engineer
  • Total Items: 23
  • Compliance: AIAG MSA, IATF 16949, ISO/TS 16949

Study Setup

Study design

  • Minimum 2-3 operators selected?
  • Minimum 10 parts selected?
  • Minimum 2-3 trials planned?

Study Execution

Data collection

  • Parts measured in random order?
  • Operators blind to part numbers?

Analysis

Results review

  • %GRR calculated?
  • %GRR acceptable (<10% preferred, <30% marginal)?

Machine Guarding

OSHA 1910 Subpart O

  • Machine guards in place?
  • E-stop buttons tested?
  • Safety interlocks functional?
  • Light curtains operational?

Chemical Safety

OSHA 1910.1200 HazCom

  • SDS sheets available?
  • Containers labeled?
  • Secondary containment?

Ergonomics

Ergonomic assessment

  • Workstation heights OK?
  • Lifting aids available?
  • Anti-fatigue mats present?

Quality Control

Product quality

  • Tools calibrated?
  • Defect rate acceptable?
  • First article approved?

Environmental Controls

Ventilation and monitoring

  • Ventilation operating?
  • Noise within limits?
  • Lighting adequate?

Related Manufacturing Checklists

Browse all 4,000+ free checklist templates

Get started with POPProbe | Book a Demo