Hot Work Permit & Fire Watch Checklist [FREE PDF]
Safety supervisors and fire watch personnel use this checklist for hot work permit issuance per OSHA 29 CFR 1910.252 fire prevention during welding/cutting and NFPA 51B fire prevention during hot work.
- Industry: General Industry / Construction
- Frequency: Per Event
- Estimated Time: 10-15 minutes
- Role: Safety Supervisor
- Total Items: 8
- Compliance: OSHA 29 CFR 1910.252, NFPA 51B
Area Preparation & Combustible Control
Verify area is prepared and combustibles are controlled.
- Are combustibles within 35 feet removed or protected with fire-resistant covers?
- Are combustible floors wet down or covered with fire-resistant material?
- Are wall and floor openings covered to prevent spark travel to adjacent areas?
- Area preparation notes
Fire Watch & Extinguishment
Verify fire watch assignment and equipment readiness.
- Is a designated fire watch assigned with training and fire extinguisher?
- Will fire watch continue for at least 30 minutes after hot work completion?
- Is a charged fire extinguisher (minimum 2A:10BC) within immediate reach?
- Fire watch notes
Related Safety Checklists
- Ladder Safety Inspection Checklist [FREE PDF]
- Scaffold Safety Inspection Checklist [FREE PDF]
- Excavation Competent Person Inspection Checklist [FREE PDF]
- Hazard Communication (HazCom/GHS) Program Checklist [FREE PDF]
Why Use This Hot Work Permit & Fire Watch Checklist [FREE PDF]?
This hot work permit & fire watch checklist [free pdf] helps general industry / construction teams maintain compliance and operational excellence. Designed for safety supervisor professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: per event.
Ensures compliance with OSHA 29 CFR 1910.252, NFPA 51B. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Hot Work Permit & Fire Watch Checklist [FREE PDF] cover?
This checklist covers 8 inspection items across 2 sections: Area Preparation & Combustible Control, Fire Watch & Extinguishment. It is designed for general industry / construction operations and compliance.
How often should this checklist be completed?
This checklist should be completed per event. Each completion takes approximately 10-15 minutes.
Who should use this Hot Work Permit & Fire Watch Checklist [FREE PDF]?
This checklist is designed for Safety Supervisor professionals in the general industry / construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.