Concrete Pour Quality & Safety Checklist
FREE concrete placement and finishing inspection checklist with ACI 301/318 and OSHA compliance. Covers formwork, reinforcement, placement, curing, and quality control. Multi-market standards for US, UK (BS EN 206), India (IS 456), Brazil (NBR 6118), Mexico (NMX-C-155), and Colombia regulations. Download FREE PDF with 55+ inspection points.
- Industry: Construction
- Frequency: Each Pour
- Estimated Time: 30-45 minutes
- Role: Operations Manager
- Total Items: 39
- Compliance: ACI 301 (Structural Concrete Specifications), ACI 318 (Building Code Requirements), OSHA 29 CFR 1926.701 (Concrete), ASTM C94 (Ready-Mixed Concrete), UK BS EN 206 (Concrete Specification)
Formwork Inspection
ACI 347 formwork requirements. Inspect before any concrete placement.
- Forms aligned to design dimensions and elevations?
- Forms securely braced and tied to resist concrete pressure?
- Form surfaces clean, oiled, and free of debris?
- Form joints sealed to prevent mortar loss?
- Chamfer strips installed at exposed corners?
- Embedded items (sleeves, inserts, anchors) properly positioned?
- Form ties at correct spacing per design?
Reinforcement Inspection
ACI 318 reinforcement placement requirements.
- Rebar sizes match drawings?
- Rebar spacing within tolerance (±1 inch)?
- Minimum concrete cover maintained?
- Rebar properly tied at intersections?
- Lap splices meet minimum length requirements?
- Rebar free of excessive rust, oil, or mud?
- Adequate chairs and bolsters to maintain position?
Concrete Delivery & Testing
ASTM C94 ready-mixed concrete requirements.
- Delivery ticket reviewed (mix, time batched, water added)?
- Concrete discharged within 90 minutes of batching?
- Slump test performed and within specification?
- Slump Value (inches)
- Air content tested (if specified)?
- Air Content (%)
- Concrete temperature within limits?
- Concrete Temperature (°F)
- Test cylinders made per specification?
Concrete Placement
ACI 304 concrete placement guidelines.
- Free-fall drop height ≤5 feet (or using tremie/pump)?
- Concrete placed continuously without cold joints?
- Internal vibration used properly?
- No visible segregation during placement?
- No water added at jobsite beyond specification?
- Weather protection measures in place (hot/cold)?
Finishing & Curing
ACI 308 curing requirements for strength development.
- Finishing operations timed correctly (after bleed water)?
- Surface finish meets specification?
- Approved curing method applied?
- Curing initiated immediately after finishing?
- Curing maintained for specified duration (typically 7 days)?
- Fresh concrete protected from traffic and damage?
PPE Compliance Verification
Personal protective equipment inspection
- Hard hats worn in required areas?
- Safety glasses/goggles worn as required?
- High-visibility vests worn?
- Steel-toe boots worn by all workers?
Related Construction Checklists
- Concrete Formwork Inspection Checklist
- Concrete Placement Inspection - FREE PDF
- Concrete Formwork Safety Inspection - FREE PDF
- Post-Tensioning Safety Checklist - FREE PDF
- Steel Erection Safety Checklist
- Scaffolding Safety Inspection Checklist
- Excavation & Trenching Safety Checklist
- Hot Work Permit & Safety Checklist
Related Concrete Checklists
- Concrete Formwork Inspection Checklist - FREE Download
- Concrete Placement Inspection - FREE PDF - FREE Download
- Concrete Formwork Safety Inspection - FREE PDF - FREE Download
- Post-Tensioning Safety Checklist - FREE PDF - FREE Download
- Tilt-Up Construction Safety - FREE PDF - FREE Download