Steel Erection Safety Checklist
FREE structural steel erection safety checklist with OSHA 1926 Subpart R compliance. Covers column stability, beam connections, decking, fall protection, and hoisting. Multi-market standards for US, UK (BS 5950), India (IS 800), Brazil (NBR 8800), Mexico (NMX), and Colombia regulations. Download FREE PDF with 50+ safety points.
- Industry: Construction
- Frequency: Daily
- Estimated Time: 25-35 minutes
- Role: Operations Manager
- Total Items: 35
- Compliance: OSHA 29 CFR 1926 Subpart R (Steel Erection), OSHA 1926.752 (Site Layout), OSHA 1926.753 (Hoisting and Rigging), OSHA 1926.754 (Structural Steel Assembly), OSHA 1926.756 (Beams and Columns)
Site Layout & Conditions
OSHA 1926.752 site layout, site-specific erection plan, and access requirements.
- Site-Specific Erection Plan (SSEP) available on-site?
- Anchor bolt repairs documented per SSEP?
- Concrete foundations cured to required strength?
- Adequate access roads for equipment and material delivery?
- Material laydown area adequate and organized?
- Underground utilities marked before any excavation?
Hoisting & Rigging
OSHA 1926.753 hoisting and rigging requirements for steel erection.
- Crane operator certified and competent?
- Crane capacity adequate for heaviest picks?
- Rigging equipment inspected before shift?
- Load weights verified before hoisting?
- Tag lines used to control loads?
- Qualified signal person designated when required?
- Multi-crane lifts planned with lift director?
Column Erection & Stability
OSHA 1926.756(a) column stability requirements.
- Column splices have minimum 4 bolts before release?
- Column anchor bolts fully tightened?
- Base plates properly leveled and grouted (if required)?
- Temporary guy cables installed where required?
- Column plumbness checked and documented?
Beam & Girder Connections
OSHA 1926.756(c) beam connection requirements.
- Double connections made according to SSEP?
- Minimum 2 bolts installed in beam connections before release?
- Connections fit without forcing (proper fabrication)?
- Washers installed where required?
- Temporary bracing installed per erection sequence?
Fall Protection
OSHA 1926.760 fall protection for steel erection (special provisions).
- Fall protection in use above 15 feet (or 2 stories)?
- If connectors between 15-30 ft, controlled decking zone used?
- Perimeter safety cables installed before decking?
- Adequate anchor points for personal fall arrest?
- Fall arrest harnesses inspected before use?
- Ladder or stair access provided to working levels?
Metal Decking & Open Web Joists
OSHA 1926.757 joist erection and 1926.758 decking requirements.
- Joists have minimum 2.5 inch bearing at each end?
- Joist bridging installed before releasing load?
- Bundle loads placed to prevent tipping/sliding?
- Metal deck tack welded or fastened to structure?
- Deck openings covered or guarded immediately?
- Shear stud installation properly sequenced?
Related Construction Checklists
- Steel Erection Daily Inspection - FREE PDF
- Steel Connector Training Verification - FREE PDF
- Column Anchor Bolt Inspection - FREE PDF
- Steel Decking Bundle Inspection - FREE PDF
- Scaffolding Safety Inspection Checklist
- Excavation & Trenching Safety Checklist
- Hot Work Permit & Safety Checklist
- Fall Protection Equipment Inspection Checklist
Related Steel Erection Checklists
- Steel Erection Daily Inspection - FREE PDF - FREE Download
- Steel Connector Training Verification - FREE PDF - FREE Download
- Column Anchor Bolt Inspection - FREE PDF - FREE Download
- Steel Decking Bundle Inspection - FREE PDF - FREE Download
- Steel Erection Daily Safety Checklist - FREE PDF - FREE Download
- Metal Decking Installation Safety - FREE PDF - FREE Download
- Construction Steel Deck Installation Inspection Checklist - FREE Download
- Construction Steel Erection Daily Safety Checklist - FREE Download
- Construction Structural Steel High Strength Bolting Checklist - FREE Download
- Construction Structural Welding Inspection Checklist - FREE Download