Construction Crane Lift Plan Checklist

Comprehensive crane lift plan checklist for routine and critical lifts per OSHA requirements.

  • Industry: Construction
  • Frequency: Per lift
  • Estimated Time: 20-30 minutes
  • Role: Lift Director/Crane Operator
  • Total Items: 22
  • Compliance: OSHA 1926.1400-1442, ASME B30.5, ASME B30.3

Load Information

Weight and rigging

  • Load weight determined?
  • Rigging weight included?
  • Total weight calculated?

Crane Capacity

Rated capacity

  • Lift radius determined?
  • Crane capacity verified for radius/configuration?
  • Load within rated capacity?

Ground Conditions

Setup area

  • Ground conditions adequate?
  • Outrigger pads adequate?
  • Crane level?

Hazards

Lift area safety

  • Power line clearance verified?
  • Swing radius barricaded?
  • Personnel cleared from lift zone?

PPE Compliance

PPE inspection

  • Hard hats worn?
  • Safety glasses worn?
  • High-vis vests worn?
  • Steel-toe boots worn?

Fall Protection

OSHA 1926 Subpart M

  • Fall protection above 6 feet?
  • Guardrails intact?
  • Harnesses inspected?

Housekeeping & Organization

Site organization

  • Walkways clear?
  • Materials stored safely?
  • Debris removed?

Related Construction Checklists

Related Equipment Safety Checklists

Why Use This Construction Crane Lift Plan Checklist?

This construction crane lift plan checklist helps construction teams maintain compliance and operational excellence. Designed for lift director/crane operator professionals, this checklist covers 22 critical inspection points across 7 sections. Recommended frequency: per lift.

Ensures compliance with OSHA 1926.1400-1442, ASME B30.5, ASME B30.3. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Construction Crane Lift Plan Checklist cover?

This checklist covers 22 inspection items across 7 sections: Load Information, Crane Capacity, Ground Conditions, Hazards, PPE Compliance, Fall Protection, Housekeeping & Organization. It is designed for construction operations and compliance.

How often should this checklist be completed?

This checklist should be completed per lift. Each completion takes approximately 20-30 minutes.

Who should use this Construction Crane Lift Plan Checklist?

This checklist is designed for Lift Director/Crane Operator professionals in the construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists