Construction Caisson Drilled Shaft Inspection Checklist

Comprehensive caisson/drilled shaft inspection checklist for deep foundation construction.

  • Industry: Construction
  • Frequency: Per shaft
  • Estimated Time: 30-45 minutes
  • Role: Inspector/Engineer
  • Total Items: 21
  • Compliance: ACI 336.1, ADSC Guidelines, Project Specifications

Excavation

Shaft drilling

  • Shaft diameter per plans?
  • Design depth achieved?
  • Bearing material verified?
  • Casing used (if required)?

Reinforcement Cage

Steel placement

  • Rebar cage inspected?
  • Centralizers installed?
  • Cage placed at correct depth?

Concrete Placement

Shaft concrete

  • Concrete slump verified?
  • Tremie method used (if wet hole)?
  • Adequate overpour?
  • Test cylinders taken?

PPE Compliance

PPE inspection

  • Hard hats worn?
  • Safety glasses worn?
  • High-vis vests worn?
  • Steel-toe boots worn?

Fall Protection

OSHA 1926 Subpart M

  • Fall protection above 6 feet?
  • Guardrails intact?
  • Harnesses inspected?

Housekeeping & Organization

Site organization

  • Walkways clear?
  • Materials stored safely?
  • Debris removed?

Related Construction Checklists

Related Foundation Checklists

Why Use This Construction Caisson Drilled Shaft Inspection Checklist?

This construction caisson drilled shaft inspection checklist helps construction teams maintain compliance and operational excellence. Designed for inspector/engineer professionals, this checklist covers 21 critical inspection points across 6 sections. Recommended frequency: per shaft.

Ensures compliance with ACI 336.1, ADSC Guidelines, Project Specifications. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Construction Caisson Drilled Shaft Inspection Checklist cover?

This checklist covers 21 inspection items across 6 sections: Excavation, Reinforcement Cage, Concrete Placement, PPE Compliance, Fall Protection, Housekeeping & Organization. It is designed for construction operations and compliance.

How often should this checklist be completed?

This checklist should be completed per shaft. Each completion takes approximately 30-45 minutes.

Who should use this Construction Caisson Drilled Shaft Inspection Checklist?

This checklist is designed for Inspector/Engineer professionals in the construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists