Construction Concrete Pump Daily Inspection Checklist

Comprehensive concrete pump daily inspection checklist for boom pumps and line pumps.

  • Industry: Construction
  • Frequency: Daily/Before each use
  • Estimated Time: 15-20 minutes
  • Role: Pump Operator
  • Total Items: 22
  • Compliance: OSHA 1926.702, ASME B30.27, Manufacturer Guidelines

Setup/Stability

Ground conditions

  • Ground solid and level?
  • Outriggers fully extended and on pads?

Boom System

Boom condition

  • Boom sections in good condition?
  • Boom cylinders ok (no leaks)?
  • Delivery hose clamps secure?

Pump System

Concrete pump

  • Hopper clean and clear?
  • Agitator working?
  • Hopper grate in place?

Hydraulic System

Fluid power

  • Hydraulic oil level ok?
  • No hydraulic leaks?

Safety Devices

Safety features

  • Emergency stop working?
  • Remote control functioning?

PPE Compliance

PPE inspection

  • Hard hats worn?
  • Safety glasses worn?
  • High-vis vests worn?
  • Steel-toe boots worn?

Fall Protection

OSHA 1926 Subpart M

  • Fall protection above 6 feet?
  • Guardrails intact?
  • Harnesses inspected?

Housekeeping & Organization

Site organization

  • Walkways clear?
  • Materials stored safely?
  • Debris removed?

Related Construction Checklists

Related Concrete Masonry Checklists

Browse More Checklists