Piece Verification

Pre-erection

  • Correct piece for location?
  • Piece undamaged?

Rigging

Lifting

  • Rigging per erection drawings?
  • Lifting at designated points only?

Placement

Setting

  • Bearing pads in place?
  • Piece positioned correctly?
  • Piece plumb and level?

Temporary Bracing

Stability

  • Temporary bracing installed before release?
  • Bracing per erection drawings?

Connections

Permanent connections

  • Connection hardware installed?

PPE Compliance

PPE inspection

  • Hard hats worn?
  • Safety glasses worn?
  • High-vis vests worn?
  • Steel-toe boots worn?

Fall Protection

OSHA 1926 Subpart M

  • Fall protection above 6 feet?
  • Guardrails intact?
  • Harnesses inspected?

Housekeeping & Organization

Site organization

  • Walkways clear?
  • Materials stored safely?
  • Debris removed?

Electrical Safety

OSHA 1926 Subpart K

  • GFCI protection on circuits?
  • Extension cords good?
  • Lockout/tagout followed?