Construction Structural Concrete Inspection Checklist

Comprehensive structural concrete special inspection checklist for footings, walls, columns, and slabs.

  • Industry: Construction
  • Frequency: Per pour
  • Estimated Time: 30-45 minutes
  • Role: Special Inspector
  • Total Items: 21
  • Compliance: ACI 318, IBC Chapter 17, Project Specifications

Pre-Pour Verification

Before concrete

  • Formwork inspected and approved?
  • Reinforcement inspected and approved?
  • Embedments and blockouts verified?

Concrete Testing

Fresh concrete

  • Slump tested and acceptable?
  • Air content tested (if required)?
  • Concrete temperature acceptable?
  • Test cylinders cast?

Placement Observation

During pour

  • Placement method acceptable?
  • Proper consolidation observed?
  • No segregation observed?

Curing

Post-placement

  • Curing method specified applied?

PPE Compliance

PPE inspection

  • Hard hats worn?
  • Safety glasses worn?
  • High-vis vests worn?
  • Steel-toe boots worn?

Fall Protection

OSHA 1926 Subpart M

  • Fall protection above 6 feet?
  • Guardrails intact?
  • Harnesses inspected?

Housekeeping & Organization

Site organization

  • Walkways clear?
  • Materials stored safely?
  • Debris removed?

Related Construction Checklists

Related Concrete Masonry Checklists

Browse More Checklists