Construction Concrete Placement Inspection Checklist

Comprehensive concrete placement inspection checklist for quality control during pours.

  • Industry: Construction
  • Frequency: Per pour
  • Estimated Time: 20-30 minutes
  • Role: Superintendent/QC Inspector
  • Total Items: 20
  • Compliance: ACI 318, ACI 301, OSHA 1926.700, Project Specifications

Pre-Pour

Before concrete arrives

  • Formwork inspected and approved?
  • Reinforcement inspected?
  • Embedments and blockouts in place?
  • Forms clean and wet (if required)?

Delivery

Concrete arrival

  • Batch ticket reviewed?
  • Slump tested?
  • Air content tested (if required)?
  • Test cylinders made?

Placement

During pour

  • Concrete properly placed (not segregated)?
  • Properly consolidated/vibrated?
  • Drop height acceptable?

Finishing/Curing

Post-placement

  • Proper finish applied?
  • Curing method applied?

PPE Compliance

PPE inspection

  • Hard hats worn?
  • Safety glasses worn?
  • High-vis vests worn?
  • Steel-toe boots worn?

Fall Protection

OSHA 1926 Subpart M

  • Fall protection above 6 feet?
  • Guardrails intact?
  • Harnesses inspected?

Related Construction Checklists

Related Concrete Masonry Checklists

Browse More Checklists