Construction Post-Tensioning Inspection Checklist

Comprehensive post-tensioning inspection checklist for bonded and unbonded PT systems.

  • Industry: Construction
  • Frequency: Per placement/stressing
  • Estimated Time: 30-45 minutes
  • Role: Special Inspector
  • Total Items: 21
  • Compliance: ACI 318, PTI M55.1, Manufacturer Specifications

Material Verification

PT materials

  • Strand grade and size correct?
  • Anchorage hardware correct?

Tendon Placement

Before pour

  • Tendon profile per drawings?
  • Tendon supports adequate?
  • Tendon spacing correct?

Stressing

Tensioning

  • Jack calibrated?
  • Concrete strength adequate for stressing?
  • Elongation measurements within tolerance?
  • Jacking force per specifications?

Grouting (Bonded)

Grout injection

  • Grouting required?
  • Grouting completed within time limits?

PPE Compliance

PPE inspection

  • Hard hats worn?
  • Safety glasses worn?
  • High-vis vests worn?
  • Steel-toe boots worn?

Fall Protection

OSHA 1926 Subpart M

  • Fall protection above 6 feet?
  • Guardrails intact?
  • Harnesses inspected?

Housekeeping & Organization

Site organization

  • Walkways clear?
  • Materials stored safely?
  • Debris removed?