Construction Post-Tensioning Inspection Checklist

Comprehensive post-tensioning inspection checklist for bonded and unbonded PT systems.

  • Industry: Construction
  • Frequency: Per placement/stressing
  • Estimated Time: 30-45 minutes
  • Role: Special Inspector
  • Total Items: 21
  • Compliance: ACI 318, PTI M55.1, Manufacturer Specifications

Material Verification

PT materials

  • Strand grade and size correct?
  • Anchorage hardware correct?

Tendon Placement

Before pour

  • Tendon profile per drawings?
  • Tendon supports adequate?
  • Tendon spacing correct?

Stressing

Tensioning

  • Jack calibrated?
  • Concrete strength adequate for stressing?
  • Elongation measurements within tolerance?
  • Jacking force per specifications?

Grouting (Bonded)

Grout injection

  • Grouting required?
  • Grouting completed within time limits?

PPE Compliance

PPE inspection

  • Hard hats worn?
  • Safety glasses worn?
  • High-vis vests worn?
  • Steel-toe boots worn?

Fall Protection

OSHA 1926 Subpart M

  • Fall protection above 6 feet?
  • Guardrails intact?
  • Harnesses inspected?

Housekeeping & Organization

Site organization

  • Walkways clear?
  • Materials stored safely?
  • Debris removed?

Related Construction Checklists

Related Concrete Masonry Checklists

Why Use This Construction Post-Tensioning Inspection Checklist?

This construction post-tensioning inspection checklist helps construction teams maintain compliance and operational excellence. Designed for special inspector professionals, this checklist covers 21 critical inspection points across 7 sections. Recommended frequency: per placement/stressing.

Ensures compliance with ACI 318, PTI M55.1, Manufacturer Specifications. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Construction Post-Tensioning Inspection Checklist cover?

This checklist covers 21 inspection items across 7 sections: Material Verification, Tendon Placement, Stressing, Grouting (Bonded), PPE Compliance, Fall Protection, Housekeeping & Organization. It is designed for construction operations and compliance.

How often should this checklist be completed?

This checklist should be completed per placement/stressing. Each completion takes approximately 30-45 minutes.

Who should use this Construction Post-Tensioning Inspection Checklist?

This checklist is designed for Special Inspector professionals in the construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists