Manufacturing Nonconforming Material Control Checklist

Comprehensive nonconforming material control checklist.

  • Industry: Manufacturing
  • Frequency: Per occurrence
  • Estimated Time: 15-20 minutes
  • Role: Quality
  • Total Items: 23
  • Compliance: ISO 9001, AS9100

Identification

Material identification

  • Nonconforming material clearly identified?
  • NCR tag applied?

Segregation

Material isolation

  • Material segregated from conforming product?

Disposition

Disposition decision

  • Disposition determined (use-as-is, rework, scrap, return)?
  • Disposition approved by authorized person?

Corrective Action

Root cause/CA

  • Corrective action required?
  • CAR initiated (if required)?

Machine Guarding

OSHA 1910 Subpart O

  • Machine guards in place?
  • E-stop buttons tested?
  • Safety interlocks functional?
  • Light curtains operational?

Chemical Safety

OSHA 1910.1200 HazCom

  • SDS sheets available?
  • Containers labeled?
  • Secondary containment?

Ergonomics

Ergonomic assessment

  • Workstation heights OK?
  • Lifting aids available?
  • Anti-fatigue mats present?

Quality Control

Product quality

  • Tools calibrated?
  • Defect rate acceptable?
  • First article approved?

Environmental Controls

Ventilation and monitoring

  • Ventilation operating?
  • Noise within limits?
  • Lighting adequate?

Related Manufacturing Checklists

Browse all 6,000+ free checklist templates

Get started with POPProbe | Book a Demo