Manufacturing Packaging and Labeling Verification Checklist

Comprehensive packaging and labeling verification checklist.

  • Industry: Manufacturing
  • Frequency: Per shipment
  • Estimated Time: 10-15 minutes
  • Role: Packaging/Shipping
  • Total Items: 20
  • Compliance: ISO 9001, Customer Requirements

Labels

Label verification

  • Label information correct?
  • Part number matches product?
  • Quantity on label matches count?

Packaging

Packaging materials

  • Correct packaging materials used?
  • Product adequately protected?

Documentation

Shipping docs

  • Packing slip included?
  • COC included (if required)?

Machine Guarding

OSHA 1910 Subpart O

  • Machine guards in place?
  • E-stop buttons tested?
  • Safety interlocks functional?
  • Light curtains operational?

Chemical Safety

OSHA 1910.1200 HazCom

  • SDS sheets available?
  • Containers labeled?
  • Secondary containment?

Ergonomics

Ergonomic assessment

  • Workstation heights OK?
  • Lifting aids available?
  • Anti-fatigue mats present?

Quality Control

Product quality

  • Tools calibrated?
  • Defect rate acceptable?
  • First article approved?

Related Manufacturing Checklists

Related Quality Management Checklists

Why Use This Manufacturing Packaging and Labeling Verification Checklist?

This manufacturing packaging and labeling verification checklist helps manufacturing teams maintain compliance and operational excellence. Designed for packaging/shipping professionals, this checklist covers 20 critical inspection points across 7 sections. Recommended frequency: per shipment.

Ensures compliance with ISO 9001, Customer Requirements. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Manufacturing Packaging and Labeling Verification Checklist cover?

This checklist covers 20 inspection items across 7 sections: Labels, Packaging, Documentation, Machine Guarding, Chemical Safety, Ergonomics, Quality Control. It is designed for manufacturing operations and compliance.

How often should this checklist be completed?

This checklist should be completed per shipment. Each completion takes approximately 10-15 minutes.

Who should use this Manufacturing Packaging and Labeling Verification Checklist?

This checklist is designed for Packaging/Shipping professionals in the manufacturing industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists