Preparation
Prepare for lockout/tagout.
- Equipment-specific LOTO procedure reviewed?
- All energy sources identified?
- All isolation points identified?
- Affected employees notified?
- Personal locks and tags available?
Shutdown & Energy Isolation
Shut down and isolate all energy sources.
- Equipment shut down using normal procedures?
- Electrical energy isolated?
- Hydraulic energy isolated and bled?
- Pneumatic energy isolated and bled?
- Mechanical energy blocked/released?
- Thermal energy addressed?
- All stored energy dissipated/restrained?
Lockout/Tagout Application
Apply locks and tags.
- Lock(s) applied to each isolation point?
- Tags attached with required information?
- Group lockout box used (if applicable)?
- All isolation points secured?
Energy Isolation Verification
Verify zero energy state.
- Tried operating controls to verify isolation?
- Controls returned to off/neutral?
- Voltage/energy tested with appropriate meter?
- Zero energy state confirmed?
Restoration (After Work Complete)
Safe removal of LOTO and restart.
- Work completed?
- All tools and materials removed?
- Machine guards replaced?
- All employees clear of equipment?
- Locks removed by authorized employee only?
- Affected employees notified of restart?
- Equipment tested and operating normally?
Machine Guarding & Safety
OSHA 1910 Subpart O machine safety
- Machine guards in place and functional?
- Emergency stop buttons tested?
- Safety light curtains operational?
- Safety interlocks functional?
Related Manufacturing Checklists
- Quality Control Incoming Inspection Checklist
- Personal Protective Equipment (PPE) Inspection Checklist
- Hazardous Materials Handling & Storage Checklist
- Compressed Gas Cylinder Safety Checklist
Why Use This Machine Lockout/Tagout (LOTO) Checklist?
This machine lockout/tagout (loto) checklist helps manufacturing teams maintain compliance and operational excellence. Designed for operations manager professionals, this checklist covers 31 critical inspection points across 6 sections. Recommended frequency: each service/maintenance.
Ensures compliance with OSHA 1910.147, ANSI/ASSE Z244.1, NFPA 70E, UK HSE Isolation Guidance, India IS 10118, India Factories Act, Brazil NR-10, Mexico NOM-004-STPS, Colombia Resolución 5018/2019. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Machine Lockout/Tagout (LOTO) Checklist cover?
This checklist covers 31 inspection items across 6 sections: Preparation, Shutdown & Energy Isolation, Lockout/Tagout Application, Energy Isolation Verification, Restoration (After Work Complete), Machine Guarding & Safety. It is designed for manufacturing operations and compliance.
How often should this checklist be completed?
This checklist should be completed each service/maintenance. Each completion takes approximately 15-20 minutes.
Who should use this Machine Lockout/Tagout (LOTO) Checklist?
This checklist is designed for Operations Manager professionals in the manufacturing industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.