Machine Lockout/Tagout (LOTO) Checklist

FREE lockout/tagout checklist with OSHA 1910.147 compliance. Covers energy isolation, verification, group lockout, and equipment restart. Multi-market standards for US OSHA, UK HSE, India IS 10118, Brazil NR-10, Mexico NOM-004-STPS, and Colombia regulations. Download FREE PDF with 45+ safety points.

  • Industry: Manufacturing
  • Frequency: Each Service/Maintenance
  • Estimated Time: 15-20 minutes
  • Role: Operations Manager
  • Total Items: 31
  • Compliance: OSHA 1910.147, ANSI/ASSE Z244.1, NFPA 70E, UK HSE Isolation Guidance, India IS 10118

Preparation

Prepare for lockout/tagout.

  • Equipment-specific LOTO procedure reviewed?
  • All energy sources identified?
  • All isolation points identified?
  • Affected employees notified?
  • Personal locks and tags available?

Shutdown & Energy Isolation

Shut down and isolate all energy sources.

  • Equipment shut down using normal procedures?
  • Electrical energy isolated?
  • Hydraulic energy isolated and bled?
  • Pneumatic energy isolated and bled?
  • Mechanical energy blocked/released?
  • Thermal energy addressed?
  • All stored energy dissipated/restrained?

Lockout/Tagout Application

Apply locks and tags.

  • Lock(s) applied to each isolation point?
  • Tags attached with required information?
  • Group lockout box used (if applicable)?
  • All isolation points secured?

Energy Isolation Verification

Verify zero energy state.

  • Tried operating controls to verify isolation?
  • Controls returned to off/neutral?
  • Voltage/energy tested with appropriate meter?
  • Zero energy state confirmed?

Restoration (After Work Complete)

Safe removal of LOTO and restart.

  • Work completed?
  • All tools and materials removed?
  • Machine guards replaced?
  • All employees clear of equipment?
  • Locks removed by authorized employee only?
  • Affected employees notified of restart?
  • Equipment tested and operating normally?

Machine Guarding & Safety

OSHA 1910 Subpart O machine safety

  • Machine guards in place and functional?
  • Emergency stop buttons tested?
  • Safety light curtains operational?
  • Safety interlocks functional?