Agrivoltaic / Dual-Use Solar Site Inspection Checklist

This agrivoltaic (dual-use solar and agriculture) site inspection checklist ensures compliance with USDA NRCS conservation practice standards, state agricultural land use regulations, NEC Article 690, EPA NPDES stormwater permit requirements, and OSHA General Industry safety standards. Designed for agrivoltaic site managers and solar O&M teams to verify that solar systems and concurrent agricultural operations (grazing, pollinator habitat, crops) are maintained safely and in regulatory complianc

  • Industry: Renewable Energy
  • Frequency: Monthly
  • Estimated Time: 2-3 hours
  • Role: Agrivoltaic Site Manager / Solar O&M Lead
  • Total Items: 30
  • Compliance: USDA NRCS Conservation Practice Standards, NEC Article 690 Solar Photovoltaic Systems, EPA NPDES Stormwater Permit Requirements, OSHA 29 CFR 1910 General Industry Safety, State Agricultural Land Use Regulations

Solar System Inspection

PV array and equipment operational check.

  • All solar arrays operational with no major faults?
  • Modules free of damage from agricultural operations?
  • DC wiring protected from animal/equipment contact?
  • Livestock guards on inverter/electrical equipment?
  • Array and Crop/Grazing Area Photo

Livestock and Grazing Management

Animal welfare and site protection for grazing operations.

  • Livestock appear healthy and have adequate food/water?
  • Livestock fencing intact and secure?
  • Vegetation height appropriate for solar panel clearance?
  • No animal damage to equipment observed?
  • Grazing/Livestock Notes

Pollinator Habitat

Native plant and pollinator management.

  • Approved native seed mix established/thriving?
  • Invasive weed management current?
  • No harmful pesticides applied per habitat agreement?
  • Adequate bloom diversity and density for pollinators?
  • Habitat Condition Photo

Crop Operations (if applicable)

Crop production and equipment safety.

  • No crop damage from solar equipment or shading?
  • Irrigation systems not interfering with electrical equipment?
  • Farm equipment operations maintained safe distance from electrical?
  • Fertilizers and pesticides stored away from electrical equipment?
  • Crop Operation Notes

Stormwater and Erosion Control

EPA and environmental compliance checks.

  • Erosion BMPs (vegetation cover, berms) in place?
  • Site drainage functioning without ponding?
  • No sediment runoff from site observed?
  • SWPPP current and filed with permitting authority?
  • Environmental Conditions Photo

Documentation and Reporting

Inspection documentation and regulatory reporting.

  • All issues documented with corrective actions?
  • Landowner/farmer notified of any concerns?
  • USDA NRCS conservation program compliance confirmed?
  • Next inspection date scheduled?
  • Inspection Notes

Related Renewable Energy Checklists

Related Solar Checklists

Why Use This Agrivoltaic / Dual-Use Solar Site Inspection Checklist?

This agrivoltaic / dual-use solar site inspection checklist helps renewable energy teams maintain compliance and operational excellence. Designed for agrivoltaic site manager / solar o&m lead professionals, this checklist covers 30 critical inspection points across 6 sections. Recommended frequency: monthly.

Ensures compliance with USDA NRCS Conservation Practice Standards, NEC Article 690 Solar Photovoltaic Systems, EPA NPDES Stormwater Permit Requirements, OSHA 29 CFR 1910 General Industry Safety, State Agricultural Land Use Regulations. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Agrivoltaic / Dual-Use Solar Site Inspection Checklist cover?

This checklist covers 30 inspection items across 6 sections: Solar System Inspection, Livestock and Grazing Management, Pollinator Habitat, Crop Operations (if applicable), Stormwater and Erosion Control, Documentation and Reporting. It is designed for renewable energy operations and compliance.

How often should this checklist be completed?

This checklist should be completed monthly. Each completion takes approximately 2-3 hours.

Who should use this Agrivoltaic / Dual-Use Solar Site Inspection Checklist?

This checklist is designed for Agrivoltaic Site Manager / Solar O&M Lead professionals in the renewable energy industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.