Solar + Battery Energy Storage System (BESS) Checklist
This solar and Battery Energy Storage System (BESS) inspection checklist ensures compliance with NFPA 855 (Standard for Installation of Stationary Energy Storage Systems), UL 9540 (Standard for Energy Storage Systems), IFC Section 1207, and NEC Article 706 (Energy Storage Systems). Designed for BESS operations technicians and safety officers to inspect lithium-ion, flow, or other battery systems paired with solar PV installations.
- Industry: Renewable Energy
- Frequency: Monthly
- Estimated Time: 2-3 hours
- Role: BESS Operations Technician / EHS Manager
- Total Items: 30
- Compliance: NFPA 855 Stationary Energy Storage Systems, UL 9540 Energy Storage System Standard, NEC Article 706 Energy Storage Systems, IFC Section 1207 Energy Storage Systems, IEEE 1635 Guide for Battery Storage Testing
Battery Management System (BMS)
BMS status and cell monitoring.
- BMS online with all cells communicating?
- State of Charge (SoC) within normal operating window?
- Cell voltage balance within tolerance (<50mV delta)?
- No active BMS fault codes or alarms?
- BMS Dashboard Screenshot
Thermal Management
Battery temperature control and thermal runaway prevention.
- All cell temperatures within safe range (per manufacturer)?
- BESS enclosure HVAC/thermal management operational?
- No signs of thermal runaway (gas venting, smoke, heat)?
- Fire suppression system within enclosure operational?
- Combustible gas detection system operational?
Electrical Systems
Power conversion system and electrical safety check.
- Power Conversion System (PCS) online and at normal status?
- DC bus voltage within normal operating range?
- No insulation fault or ground fault detected?
- Emergency DC and AC disconnects accessible and functional?
- Arc-rated PPE and battery-specific PPE available?
Physical Inspection
Battery enclosure and cell physical condition.
- Battery enclosure seals and doors in good condition?
- No visible cell swelling or deformation?
- No corrosion on terminals or bus bars?
- No electrolyte leaks observed?
- Battery Physical Condition Photo
Fire and Life Safety
Emergency systems and egress per NFPA 855.
- Fire suppression system armed and pressure adequate?
- Smoke and heat detectors functional in BESS room?
- Emergency egress from BESS enclosure clear?
- Emergency response plan for BESS thermal event posted?
- Local fire department pre-plan/notification current?
Performance and Documentation
BESS performance and compliance documentation.
- Cycle count within warranty terms?
- Measured capacity within warranted SOH degradation curve?
- Maintenance log current?
- UL 9540 certification documentation on file?
- Inspection Notes
Related Renewable Energy Checklists
- Agrivoltaic / Dual-Use Solar Site Inspection Checklist
- Solar Carport/Canopy Inspection Checklist
- Solar Panel Cleaning and Soiling Management Checklist
- Floating Solar (Floatovoltaic) System Inspection Checklist
- Wind Turbine Daily Operations Checklist
- Wind Turbine Tower Climb Safety Checklist
- Wind Turbine Gearbox Preventive Maintenance Checklist
- Wind Turbine Blade Inspection Checklist
Related Solar Checklists
- Solar PV System Daily Inspection Checklist - FREE Download
- Solar Thermal System Inspection Checklist - FREE Download
- Solar PV System Commissioning Checklist - FREE Download
- Solar Rooftop Work Safety Checklist - FREE Download
- Solar String Inverter Preventive Maintenance Checklist - FREE Download
- Utility-Scale Solar Farm O&M Inspection Checklist - FREE Download
- Agrivoltaic / Dual-Use Solar Site Inspection Checklist - FREE Download
- Solar Carport/Canopy Inspection Checklist - FREE Download
- Solar Panel Cleaning and Soiling Management Checklist - FREE Download
- Floating Solar (Floatovoltaic) System Inspection Checklist - FREE Download
Why Use This Solar + Battery Energy Storage System (BESS) Checklist?
This solar + battery energy storage system (bess) checklist helps renewable energy teams maintain compliance and operational excellence. Designed for bess operations technician / ehs manager professionals, this checklist covers 30 critical inspection points across 6 sections. Recommended frequency: monthly.
Ensures compliance with NFPA 855 Stationary Energy Storage Systems, UL 9540 Energy Storage System Standard, NEC Article 706 Energy Storage Systems, IFC Section 1207 Energy Storage Systems, IEEE 1635 Guide for Battery Storage Testing. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Solar + Battery Energy Storage System (BESS) Checklist cover?
This checklist covers 30 inspection items across 6 sections: Battery Management System (BMS), Thermal Management, Electrical Systems, Physical Inspection, Fire and Life Safety, Performance and Documentation. It is designed for renewable energy operations and compliance.
How often should this checklist be completed?
This checklist should be completed monthly. Each completion takes approximately 2-3 hours.
Who should use this Solar + Battery Energy Storage System (BESS) Checklist?
This checklist is designed for BESS Operations Technician / EHS Manager professionals in the renewable energy industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.