Solar Rooftop Work Safety Checklist

This solar rooftop work safety checklist ensures compliance with OSHA 29 CFR 1926 Subpart R (Steel Erection), OSHA 1926 Subpart M (Fall Protection), NFPA 70E electrical safety requirements, and ANSI Z359 fall protection standards. Designed for solar installation crews and safety officers to verify fall protection, electrical isolation, and rooftop safety conditions before and during solar panel installation and maintenance activities.

  • Industry: Renewable Energy
  • Frequency: Per Event
  • Estimated Time: 20-30 minutes
  • Role: Solar Installation Safety Officer / Lead Installer
  • Total Items: 30
  • Compliance: OSHA 29 CFR 1926 Subpart M Fall Protection, OSHA 29 CFR 1926 Subpart R Steel Erection, NFPA 70E Electrical Safety, ANSI Z359 Fall Protection Code, OSHA 29 CFR 1910.147 Lockout/Tagout

Fall Protection

Fall protection systems per OSHA 1926 Subpart M.

  • Approved fall protection system in place (guardrail, PFAS, safety net)?
  • Fall protection anchor points rated >5,000 lbs per worker?
  • All harnesses pre-use inspected and in good condition?
  • Lanyards/self-retracting lifelines inspected?
  • Roof edge protection or warning line in place?

Electrical Isolation

Electrical system lockout/tagout before rooftop work.

  • Lockout/tagout applied to all electrical energy sources?
  • DC circuits isolated using rapid shutdown or DC disconnects?
  • Zero energy state verified with appropriate test instrument?
  • Arc-rated PPE available and worn for electrical work?
  • Electrical work performed with qualified partner present?

Roof Condition Assessment

Structural and surface safety assessment.

  • Roof structural loading reviewed and adequate?
  • Roof surface free of hazards (slippery areas, soft spots, holes)?
  • Skylights and roof openings covered or guarded?
  • Wind speed within safe working limits (<25 mph)?
  • Safe roof access (ladder, stairway) in place?

Material Handling Safety

Panel and equipment hoisting safety.

  • Hoisting equipment rated for panel weights?
  • Rigging equipment inspected by qualified rigger?
  • Drop zone below work area barricaded?
  • Tools and materials tethered to prevent drops?
  • Toe boards installed at roof edges where materials stored?

PPE and Communications

Personal protective equipment and crew communication.

  • Hard hats worn by all workers?
  • Safety glasses worn?
  • Slip-resistant footwear worn by all workers?
  • Two-way radio or communication protocol established?
  • Emergency rescue plan for fallen worker communicated?

Work Completion and Site Closeout

End-of-work safety closeout.

  • All tools and materials cleared from roof?
  • All LOTO devices removed per procedure?
  • All workers safely off roof and accounted for?
  • Any near-misses or incidents documented?
  • Daily Safety Notes

Related Renewable Energy Checklists

Related Solar Checklists

Why Use This Solar Rooftop Work Safety Checklist?

This solar rooftop work safety checklist helps renewable energy teams maintain compliance and operational excellence. Designed for solar installation safety officer / lead installer professionals, this checklist covers 30 critical inspection points across 6 sections. Recommended frequency: per event.

Ensures compliance with OSHA 29 CFR 1926 Subpart M Fall Protection, OSHA 29 CFR 1926 Subpart R Steel Erection, NFPA 70E Electrical Safety, ANSI Z359 Fall Protection Code, OSHA 29 CFR 1910.147 Lockout/Tagout. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Solar Rooftop Work Safety Checklist cover?

This checklist covers 30 inspection items across 6 sections: Fall Protection, Electrical Isolation, Roof Condition Assessment, Material Handling Safety, PPE and Communications, Work Completion and Site Closeout. It is designed for renewable energy operations and compliance.

How often should this checklist be completed?

This checklist should be completed per event. Each completion takes approximately 20-30 minutes.

Who should use this Solar Rooftop Work Safety Checklist?

This checklist is designed for Solar Installation Safety Officer / Lead Installer professionals in the renewable energy industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists