Manufacturing SMED Quick Changeover Checklist

Comprehensive SMED quick changeover checklist for manufacturing setup reduction.

  • Industry: Manufacturing
  • Frequency: Per changeover
  • Estimated Time: Variable
  • Role: Setup Technician
  • Total Items: 20
  • Compliance: Lean Manufacturing, SMED Methodology

Preparation (External)

Before stopping

  • All tools staged?
  • Next dies/tooling ready?
  • Next materials staged?

Changeover (Internal)

Machine stopped

  • Following standard changeover procedure?
  • Parallel operations used where possible?

Startup

Post-changeover

  • First piece inspected and approved?
  • Changeover time recorded?

Machine Guarding

OSHA 1910 Subpart O

  • Machine guards in place?
  • E-stop buttons tested?
  • Safety interlocks functional?
  • Light curtains operational?

Chemical Safety

OSHA 1910.1200 HazCom

  • SDS sheets available?
  • Containers labeled?
  • Secondary containment?

Ergonomics

Ergonomic assessment

  • Workstation heights OK?
  • Lifting aids available?
  • Anti-fatigue mats present?

Quality Control

Product quality

  • Tools calibrated?
  • Defect rate acceptable?
  • First article approved?

Related Manufacturing Checklists

Related Lean Manufacturing Checklists

Why Use This Manufacturing SMED Quick Changeover Checklist?

This manufacturing smed quick changeover checklist helps manufacturing teams maintain compliance and operational excellence. Designed for setup technician professionals, this checklist covers 20 critical inspection points across 7 sections. Recommended frequency: per changeover.

Ensures compliance with Lean Manufacturing, SMED Methodology. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Manufacturing SMED Quick Changeover Checklist cover?

This checklist covers 20 inspection items across 7 sections: Preparation (External), Changeover (Internal), Startup, Machine Guarding, Chemical Safety, Ergonomics, Quality Control. It is designed for manufacturing operations and compliance.

How often should this checklist be completed?

This checklist should be completed per changeover. Each completion takes approximately Variable.

Who should use this Manufacturing SMED Quick Changeover Checklist?

This checklist is designed for Setup Technician professionals in the manufacturing industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.