Solar PV Performance Guarantee Compliance Checklist

This solar PV performance guarantee compliance checklist ensures compliance with IEC 61724 (Photovoltaic System Performance Monitoring), IEC 62446 reporting requirements, PPA contracted performance guarantee provisions, module manufacturer power output warranty terms, and inverter manufacturer efficiency warranty conditions. Designed for solar asset managers and O&M teams to systematically verify that system performance meets all contractual obligations and manufacturer warranty thresholds.

  • Industry: Renewable Energy
  • Frequency: Monthly
  • Estimated Time: 2-3 hours
  • Role: Solar Asset Manager / Performance Engineer
  • Total Items: 30
  • Compliance: IEC 61724-1 Photovoltaic System Performance Monitoring, IEC 62446-2 PV System Maintenance Requirements, PPA Performance Guarantee Contract Provisions, Module Manufacturer Power Output Warranty, Inverter Manufacturer Performance Warranty

Energy Production Analysis

Actual vs. modeled energy production.

  • Actual generation within P50 forecast range?
  • Performance Ratio (PR) meeting contractual minimum?
  • System availability meeting O&M contract guarantee (>97%)?
  • Curtailment losses documented and buyer/lender notified?
  • YTD production on track for annual guarantee?

Irradiance and Weather Correction

Weather-corrected performance analysis.

  • On-site irradiance data of acceptable quality?
  • Temperature correction applied to performance calculations?
  • Soiling correction factor applied?
  • Module degradation within warranted annual rate (<0.7%/yr)?
  • On-site vs satellite irradiance data cross-checked?

Module Warranty Compliance

Module power output warranty tracking.

  • Module power output within warranty degradation curve?
  • Spot power testing (Pmax) conducted on representative sample?
  • Any module warranty claims filed with manufacturer?
  • Module serial number inventory current?
  • EL imaging or IV curve testing scheduled for underperforming areas?

Inverter Warranty Compliance

Inverter efficiency and warranty tracking.

  • CEC efficiency within 1% of warranted efficiency?
  • Inverter availability >99% (manufacturer warranty)?
  • Any inverter warranty claims filed?
  • Inverter firmware updated to latest version?
  • Extended warranties current and active?

Loss Analysis

System loss quantification and attribution.

  • Soiling losses quantified and below PPA allowance?
  • Downtime losses documented and excluded from guarantees per PPA?
  • Curtailment losses attributed and excluded per contract?
  • Shading losses consistent with modeled expectations?
  • Parasitic load consumption within expected range?

Reporting and Compliance

Performance reporting and contract compliance.

  • Monthly performance report prepared for owner/lender?
  • Annual guarantee shortfall/surplus tracked?
  • Required performance data submitted to PPA buyer?
  • Any performance shortfall compensation amounts calculated?
  • Performance Analysis Notes

Related Renewable Energy Checklists

Related Solar Checklists

Why Use This Solar PV Performance Guarantee Compliance Checklist?

This solar pv performance guarantee compliance checklist helps renewable energy teams maintain compliance and operational excellence. Designed for solar asset manager / performance engineer professionals, this checklist covers 30 critical inspection points across 6 sections. Recommended frequency: monthly.

Ensures compliance with IEC 61724-1 Photovoltaic System Performance Monitoring, IEC 62446-2 PV System Maintenance Requirements, PPA Performance Guarantee Contract Provisions, Module Manufacturer Power Output Warranty, Inverter Manufacturer Performance Warranty. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Solar PV Performance Guarantee Compliance Checklist cover?

This checklist covers 30 inspection items across 6 sections: Energy Production Analysis, Irradiance and Weather Correction, Module Warranty Compliance, Inverter Warranty Compliance, Loss Analysis, Reporting and Compliance. It is designed for renewable energy operations and compliance.

How often should this checklist be completed?

This checklist should be completed monthly. Each completion takes approximately 2-3 hours.

Who should use this Solar PV Performance Guarantee Compliance Checklist?

This checklist is designed for Solar Asset Manager / Performance Engineer professionals in the renewable energy industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.