Construction Portable Generator Inspection Checklist

Comprehensive portable generator inspection checklist for construction site temporary power.

  • Industry: Construction
  • Frequency: Before each use
  • Estimated Time: 10-15 minutes
  • Role: Electrician/Operator
  • Total Items: 20
  • Compliance: OSHA 1926.405, NFPA 70E, Manufacturer Guidelines

Fuel System

Fuel and oil

  • Fuel level adequate?
  • Oil level ok?
  • No fuel or oil leaks?

Electrical

Electrical connections

  • Outlets in good condition?
  • Properly grounded?
  • GFCI protection available?

Operation

Run check

  • Starts and runs properly?
  • Voltage output correct?

Safety

Safe operation

  • Adequate ventilation (outdoor use)?
  • Fire extinguisher nearby?

PPE Compliance

PPE inspection

  • Hard hats worn?
  • Safety glasses worn?
  • High-vis vests worn?
  • Steel-toe boots worn?

Fall Protection

OSHA 1926 Subpart M

  • Fall protection above 6 feet?
  • Guardrails intact?
  • Harnesses inspected?

Housekeeping & Organization

Site organization

  • Walkways clear?
  • Materials stored safely?
  • Debris removed?