Electrical Panel Lockout/Tagout Checklist

FREE electrical panel LOTO checklist with OSHA 1910.147 and NFPA 70E compliance. Covers electrical isolation, zero energy verification, and arc flash protection. Multi-market standards for US, UK (BS 7671), India (IS 3043), Brazil (NR-10), Mexico (NOM-029-STPS), and Colombia regulations. Download FREE PDF with 50+ safety points.

  • Industry: Construction
  • Frequency: Each Maintenance Event
  • Estimated Time: 20-30 minutes
  • Role: Operations Manager
  • Total Items: 34
  • Compliance: OSHA 29 CFR 1910.147 (LOTO), OSHA 29 CFR 1910.333 (Electrical Safety), NFPA 70E (Arc Flash), NFPA 70 NEC, UK BS 7671 (Wiring Regulations)

Pre-Lockout Preparation

OSHA 1910.147(d)(1) preparation requirements before applying lockout.

  • Energy control procedure reviewed for this equipment?
  • All energy sources identified (electrical, stored, capacitive)?
  • All affected employees notified of lockout?
  • Arc flash label present and legible?
  • Appropriate arc-rated PPE selected based on hazard analysis?
  • Arc flash PPE inspected and in good condition?

Lockout Application

OSHA 1910.147(d)(4) lockout/tagout device application.

  • Equipment shut down using normal stopping procedure?
  • Main disconnect switch opened/circuit breaker tripped?
  • Personal lock applied to energy isolating device?
  • Lockout tag attached with name, date, and reason?
  • If multiple workers, each applied their own lock (group lockout)?
  • Stored/residual energy dissipated or restrained?

Zero Energy Verification

OSHA 1910.147(d)(6) verification of isolation effectiveness.

  • Voltage meter tested on known live source first?
  • Zero voltage verified at all phases and ground?
  • Meter re-tested on known live source after verification?
  • Attempt to start equipment at normal controls (if safe)?
  • All downstream equipment verified de-energized?
  • Capacitors discharged and grounded (if present)?

Restoration Procedure

OSHA 1910.147(e) release from lockout/tagout.

  • All maintenance/service work completed?
  • All tools and materials removed from equipment?
  • All guards and covers reinstalled?
  • Work area clear of personnel?
  • All affected employees notified of restoration?
  • Each authorized employee removed their own lock?

Pre-Inspection Setup & Documentation

Initial documentation and site preparation verification

  • Inspector Name
  • Inspection Date
  • Project Name / Job Number
  • Current Weather Conditions
  • Previous inspection findings reviewed?

Safety & Compliance Verification

Verify compliance with applicable OSHA regulations and site safety plan

  • Site safety plan posted and accessible?
  • All required permits current and displayed?
  • SDS/MSDS sheets available for all chemicals on site?
  • First aid supplies accessible and stocked?
  • Emergency contact information posted?