Construction Electrical Grounding Bonding Inspection Checklist

Comprehensive electrical grounding and bonding inspection checklist for construction site temporary electrical systems.

  • Industry: Construction
  • Frequency: Monthly/After modification
  • Estimated Time: 20-30 minutes
  • Role: Electrician/Inspector
  • Total Items: 22
  • Compliance: OSHA 1926.404, NEC Article 250, NFPA 70E

GFCI Protection

Ground fault protection

  • GFCI protection installed?
  • GFCI tested and functional?

Grounding Electrode

Earth connection

  • Grounding electrode installed?
  • Connection to electrode secure?

Grounding Conductors

Wire sizing and routing

  • Conductors properly sized?
  • All connections tight?
  • No damage to conductors?

Equipment Grounding

Equipment bonding

  • All equipment properly grounded?
  • Grounding continuity verified?

PPE Compliance

PPE inspection

  • Hard hats worn?
  • Safety glasses worn?
  • High-vis vests worn?
  • Steel-toe boots worn?

Fall Protection

OSHA 1926 Subpart M

  • Fall protection above 6 feet?
  • Guardrails intact?
  • Harnesses inspected?

Housekeeping & Organization

Site organization

  • Walkways clear?
  • Materials stored safely?
  • Debris removed?

Electrical Safety

OSHA 1926 Subpart K

  • GFCI protection on circuits?
  • Extension cords good?
  • Lockout/tagout followed?