Solar-Plus-Storage System Integration and Operations Checklist

This solar-plus-storage system integration and operations checklist ensures compliance with FERC Order 841 (Electric Storage Participation in Markets), IEEE 1547 (Interconnection Standards), NEC Article 706 (Energy Storage Systems), UL 9540 equipment requirements, and IRS Investment Tax Credit (ITC) qualification requirements for co-located solar-storage systems. Designed for solar-plus-storage project managers and O&M teams to verify integrated system operations, charging protocols, and market

  • Industry: Renewable Energy
  • Frequency: Monthly
  • Estimated Time: 2-3 hours
  • Role: Solar-Plus-Storage O&M Manager / Asset Manager
  • Total Items: 30
  • Compliance: FERC Order 841 Electric Storage Participation in Markets, IEEE 1547 Standard for Interconnection and Interoperability, NEC Article 706 Energy Storage Systems, UL 9540 Energy Storage Systems and Equipment, IRS Notice 2023-29 ITC Requirements for Solar-Plus-Storage

Charging Protocol Compliance

ITC qualified solar charging verification.

  • BESS charging primarily from co-located solar per ITC requirements?
  • Solar vs grid charging percentage tracked and documented?
  • 75% solar charging threshold being met monthly?
  • Charging schedule optimized for maximum solar utilization?
  • Any grid charging events documented with justification?

Dispatch Optimization

Energy storage dispatch and market participation.

  • Energy Management System (EMS) optimizing dispatch?
  • BESS participating in ancillary services per FERC Order 841?
  • Behind-the-meter peak shaving achieving target demand reduction?
  • System round-trip efficiency within contract specification?
  • Solar curtailment being captured by BESS where possible?

Integrated Control System

Solar-BESS control integration.

  • EMS receiving real-time solar production data?
  • EMS communicating with BMS for BESS dispatch?
  • EMS receiving grid operator signals (frequency, curtailment)?
  • Solar forecast integrated into EMS dispatch optimization?
  • Manual override capability for EMS dispatch tested?

Interconnection Compliance

IEEE 1547 and utility interconnection requirements.

  • Combined solar+storage export not exceeding interconnection limit?
  • Protection settings for combined system verified?
  • Combined system telemetry to grid operator accurate?
  • Interconnection Agreement amended to include BESS (if required)?
  • Revenue metering correctly accounting for combined output?

Integrated System Performance

Combined solar-storage performance metrics.

  • BESS energy value (arbitrage, ancillary) meeting projections?
  • Solar self-consumption rate meeting target?
  • BESS cycle count within warranty cycle limit?
  • BESS capacity degradation within warranted annual rate?
  • Solar PR unaffected by BESS integration?

Compliance Reporting

ITC, FERC, and utility reporting.

  • ITC qualified charging documentation maintained for tax records?
  • FERC storage participation reports current (if applicable)?
  • Monthly integrated performance report prepared?
  • Utility-required storage reporting current?
  • Integration Operations Notes

Related Renewable Energy Checklists

Related Solar Checklists

Why Use This Solar-Plus-Storage System Integration and Operations Checklist?

This solar-plus-storage system integration and operations checklist helps renewable energy teams maintain compliance and operational excellence. Designed for solar-plus-storage o&m manager / asset manager professionals, this checklist covers 30 critical inspection points across 6 sections. Recommended frequency: monthly.

Ensures compliance with FERC Order 841 Electric Storage Participation in Markets, IEEE 1547 Standard for Interconnection and Interoperability, NEC Article 706 Energy Storage Systems, UL 9540 Energy Storage Systems and Equipment, IRS Notice 2023-29 ITC Requirements for Solar-Plus-Storage. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Solar-Plus-Storage System Integration and Operations Checklist cover?

This checklist covers 30 inspection items across 6 sections: Charging Protocol Compliance, Dispatch Optimization, Integrated Control System, Interconnection Compliance, Integrated System Performance, Compliance Reporting. It is designed for renewable energy operations and compliance.

How often should this checklist be completed?

This checklist should be completed monthly. Each completion takes approximately 2-3 hours.

Who should use this Solar-Plus-Storage System Integration and Operations Checklist?

This checklist is designed for Solar-Plus-Storage O&M Manager / Asset Manager professionals in the renewable energy industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.