Electrical Panel & Switchgear Inspection Checklist [FREE PDF]

Facility electricians and maintenance engineers use this checklist for electrical panel and switchgear inspection per NEC (NFPA 70) installation standards and NFPA 70B recommended practice for electrical equipment maintenance.

  • Industry: General Industry / Facilities
  • Frequency: Annually
  • Estimated Time: 20-25 minutes
  • Role: Facility Electrician
  • Total Items: 8
  • Compliance: NEC NFPA 70, NFPA 70B

Panel Condition & Access

Inspect panel physical condition and working clearance.

  • Is the required 36-inch minimum working clearance maintained in front of the panel?
  • Are all panel covers, dead fronts, and knockouts in place?
  • Is the panel directory accurate and up-to-date with all circuits identified?
  • Panel condition notes

Connections & Thermal Condition

Inspect electrical connections and check for thermal anomalies.

  • Are bus bar and terminal connections tight without discoloration or charring?
  • Has infrared thermography been performed to identify hot spots?
  • Are circuit breakers operating properly with no tripped or bypassed devices?
  • Connection and thermal notes

Related Electrical Safety Checklists

Related Electrical Systems Checklists

Why Use This Electrical Panel & Switchgear Inspection Checklist [FREE PDF]?

This electrical panel & switchgear inspection checklist [free pdf] helps general industry / facilities teams maintain compliance and operational excellence. Designed for facility electrician professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: annually.

Ensures compliance with NEC NFPA 70, NFPA 70B. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Electrical Panel & Switchgear Inspection Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Panel Condition & Access, Connections & Thermal Condition. It is designed for general industry / facilities operations and compliance.

How often should this checklist be completed?

This checklist should be completed annually. Each completion takes approximately 20-25 minutes.

Who should use this Electrical Panel & Switchgear Inspection Checklist [FREE PDF]?

This checklist is designed for Facility Electrician professionals in the general industry / facilities industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists