Temporary Electrical Wiring Inspection Checklist [FREE PDF]

Electrical inspectors and site safety officers use this checklist for temporary electrical wiring inspection per NEC Article 590 temporary installations and OSHA 1926.405 construction temporary wiring requirements.

  • Industry: Construction
  • Frequency: Weekly
  • Estimated Time: 10-15 minutes
  • Role: Site Safety Officer
  • Total Items: 8
  • Compliance: NEC Article 590, OSHA 29 CFR 1926.405

Wiring & Physical Protection

Inspect temporary wiring installation and protection.

  • Are extension cords rated for hard or extra-hard usage (S, ST, SO types)?
  • Are all temporary cords free of splices, cuts, and insulation damage?
  • Are cords protected from physical damage where passing through doorways or traffic areas?
  • Wiring protection notes

GFCI Protection & Grounding

Verify GFCI protection and grounding for temporary circuits.

  • Are all temporary 15A and 20A, 125V receptacles GFCI protected?
  • Is the temporary power distribution properly grounded?
  • Is temporary wiring removed promptly after the work it serves is completed?
  • GFCI and grounding notes

Related Electrical Safety Checklists

Related Electrical Systems Checklists

Why Use This Temporary Electrical Wiring Inspection Checklist [FREE PDF]?

This temporary electrical wiring inspection checklist [free pdf] helps construction teams maintain compliance and operational excellence. Designed for site safety officer professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: weekly.

Ensures compliance with NEC Article 590, OSHA 29 CFR 1926.405. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Temporary Electrical Wiring Inspection Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Wiring & Physical Protection, GFCI Protection & Grounding. It is designed for construction operations and compliance.

How often should this checklist be completed?

This checklist should be completed weekly. Each completion takes approximately 10-15 minutes.

Who should use this Temporary Electrical Wiring Inspection Checklist [FREE PDF]?

This checklist is designed for Site Safety Officer professionals in the construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists