Electrical Grounding & Bonding System Checklist [FREE PDF]

Electrical contractors and inspectors use this checklist for grounding and bonding system verification per NEC Article 250 grounding and bonding requirements for electrical system safety.

  • Industry: General Industry / Construction
  • Frequency: Annually
  • Estimated Time: 20-25 minutes
  • Role: Electrical Contractor
  • Total Items: 8
  • Compliance: NEC Article 250, IEEE Std 142

Grounding Electrode System

Verify grounding electrode system integrity and connections.

  • Is the grounding electrode system complete per NEC 250.50?
  • Is the ground electrode resistance within acceptable limits (25 ohms or less)?
  • Are grounding electrode conductor connections tight and corrosion-free?
  • Grounding electrode notes

Equipment Grounding & Bonding

Verify equipment grounding and bonding connections.

  • Is equipment grounding conductor continuity verified throughout the system?
  • Are metallic raceways, enclosures, and piping systems properly bonded?
  • Is the neutral-ground bond present only at the service entrance or separately derived system?
  • Equipment bonding notes

Related Electrical Safety Checklists

Related Electrical Systems Checklists

Why Use This Electrical Grounding & Bonding System Checklist [FREE PDF]?

This electrical grounding & bonding system checklist [free pdf] helps general industry / construction teams maintain compliance and operational excellence. Designed for electrical contractor professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: annually.

Ensures compliance with NEC Article 250, IEEE Std 142. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Electrical Grounding & Bonding System Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Grounding Electrode System, Equipment Grounding & Bonding. It is designed for general industry / construction operations and compliance.

How often should this checklist be completed?

This checklist should be completed annually. Each completion takes approximately 20-25 minutes.

Who should use this Electrical Grounding & Bonding System Checklist [FREE PDF]?

This checklist is designed for Electrical Contractor professionals in the general industry / construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists