Emergency Generator & Transfer Switch Checklist [FREE PDF]

Facility engineers and electricians use this checklist for emergency generator and transfer switch inspection per NFPA 110 emergency and standby power systems and NEC Article 700 emergency system requirements.

  • Industry: Facilities / Healthcare
  • Frequency: Monthly
  • Estimated Time: 15-20 minutes
  • Role: Facility Engineer
  • Total Items: 8
  • Compliance: NFPA 110, NEC Article 700

Generator Condition & Readiness

Inspect generator physical condition and operational readiness.

  • Is the fuel tank at or above the minimum required level for rated run time?
  • Is the starting battery charged and battery charger functioning?
  • Are coolant level, oil level, and belt tension within specifications?
  • Generator condition notes

Load Testing & Transfer Switch

Verify load testing schedule and transfer switch operation.

  • Has the generator been load tested per NFPA 110 schedule (monthly minimum 30 min)?
  • Does the automatic transfer switch operate within 10 seconds on power loss?
  • Does the ATS retransfer to normal power when utility is restored?
  • Testing and transfer notes

Related Electrical Safety Checklists

Related Electrical Systems Checklists

Why Use This Emergency Generator & Transfer Switch Checklist [FREE PDF]?

This emergency generator & transfer switch checklist [free pdf] helps facilities / healthcare teams maintain compliance and operational excellence. Designed for facility engineer professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: monthly.

Ensures compliance with NFPA 110, NEC Article 700. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Emergency Generator & Transfer Switch Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Generator Condition & Readiness, Load Testing & Transfer Switch. It is designed for facilities / healthcare operations and compliance.

How often should this checklist be completed?

This checklist should be completed monthly. Each completion takes approximately 15-20 minutes.

Who should use this Emergency Generator & Transfer Switch Checklist [FREE PDF]?

This checklist is designed for Facility Engineer professionals in the facilities / healthcare industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.