Lightning Protection System Inspection Checklist [FREE PDF]

Lightning protection specialists and facility engineers use this checklist per NFPA 780 standard for installation of lightning protection systems and UL 96A lightning protection component standards.

  • Industry: Facilities / General
  • Frequency: Annually
  • Estimated Time: 20-25 minutes
  • Role: Lightning Protection Specialist
  • Total Items: 8
  • Compliance: NFPA 780, UL 96A

Air Terminals & Conductors

Inspect air terminals, down conductors, and bonding.

  • Are air terminals (lightning rods) properly spaced and securely mounted?
  • Are main conductors continuous, properly bonded, and free of damage?
  • Are rooftop metallic bodies (HVAC, antennas, railings) bonded to the system?
  • Air terminal and conductor notes

Grounding & Surge Protection

Verify grounding electrodes and surge protection devices.

  • Are grounding electrodes present at each down conductor and resistance tested?
  • Are surge protection devices (SPDs) installed at the service entrance?
  • Is the lightning protection ground interconnected with the electrical grounding system?
  • Grounding and SPD notes

Related Electrical Safety Checklists

Related Electrical Systems Checklists

Why Use This Lightning Protection System Inspection Checklist [FREE PDF]?

This lightning protection system inspection checklist [free pdf] helps facilities / general teams maintain compliance and operational excellence. Designed for lightning protection specialist professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: annually.

Ensures compliance with NFPA 780, UL 96A. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Lightning Protection System Inspection Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Air Terminals & Conductors, Grounding & Surge Protection. It is designed for facilities / general operations and compliance.

How often should this checklist be completed?

This checklist should be completed annually. Each completion takes approximately 20-25 minutes.

Who should use this Lightning Protection System Inspection Checklist [FREE PDF]?

This checklist is designed for Lightning Protection Specialist professionals in the facilities / general industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists