UPS & Battery System Inspection Checklist [FREE PDF]

Data center engineers and facility electricians use this checklist for UPS and battery system inspection per NFPA 111 stored electrical energy systems and IEEE 1188 maintenance of VRLA batteries standards.

  • Industry: IT / Facilities
  • Frequency: Quarterly
  • Estimated Time: 15-20 minutes
  • Role: Data Center Engineer
  • Total Items: 8
  • Compliance: NFPA 111, IEEE 1188

UPS Operation & Status

Verify UPS operational status and alarm conditions.

  • Is the UPS operating in normal (online) mode with no active alarms?
  • Is the UPS load level within the rated capacity (typically below 80%)?
  • Is the static bypass available and functioning for automatic transfer?
  • UPS operation notes

Battery Condition & Testing

Inspect battery condition and test records.

  • Are batteries free of swelling, leaking, corrosion, and elevated temperatures?
  • Have battery impedance/resistance tests been performed this quarter?
  • Is the battery room ventilation adequate with hydrogen detection if applicable?
  • Battery condition notes

Related Electrical Safety Checklists

Related Electrical Systems Checklists

Why Use This UPS & Battery System Inspection Checklist [FREE PDF]?

This ups & battery system inspection checklist [free pdf] helps it / facilities teams maintain compliance and operational excellence. Designed for data center engineer professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: quarterly.

Ensures compliance with NFPA 111, IEEE 1188. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the UPS & Battery System Inspection Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: UPS Operation & Status, Battery Condition & Testing. It is designed for it / facilities operations and compliance.

How often should this checklist be completed?

This checklist should be completed quarterly. Each completion takes approximately 15-20 minutes.

Who should use this UPS & Battery System Inspection Checklist [FREE PDF]?

This checklist is designed for Data Center Engineer professionals in the it / facilities industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists