Energized Electrical Work Permit Checklist [FREE PDF]

Qualified electrical workers and safety managers use this checklist for energized electrical work permits per NFPA 70E Article 130.2 energized electrical work permit requirements and justification process.

  • Industry: General Industry
  • Frequency: Per Event
  • Estimated Time: 10-15 minutes
  • Role: Qualified Electrical Worker
  • Total Items: 8
  • Compliance: NFPA 70E Article 130.2, OSHA 29 CFR 1910.333

Work Justification & Hazard Assessment

Verify energized work justification and shock/arc flash assessment.

  • Is energized work justified (de-energizing creates greater hazard or is infeasible)?
  • Has a shock and arc flash hazard assessment been completed for this task?
  • Has the energized work permit been approved by management/safety?
  • Justification notes

Safety Controls & PPE

Verify safety controls and arc-rated PPE for the work.

  • Is the worker wearing arc-rated PPE matching or exceeding the incident energy?
  • Are barricades and safety signs in place to protect unqualified persons?
  • Is a safety attendant (buddy) present during the energized work?
  • Controls and PPE notes

Related Electrical Safety Checklists

Related Electrical Systems Checklists

Why Use This Energized Electrical Work Permit Checklist [FREE PDF]?

This energized electrical work permit checklist [free pdf] helps general industry teams maintain compliance and operational excellence. Designed for qualified electrical worker professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: per event.

Ensures compliance with NFPA 70E Article 130.2, OSHA 29 CFR 1910.333. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Energized Electrical Work Permit Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Work Justification & Hazard Assessment, Safety Controls & PPE. It is designed for general industry operations and compliance.

How often should this checklist be completed?

This checklist should be completed per event. Each completion takes approximately 10-15 minutes.

Who should use this Energized Electrical Work Permit Checklist [FREE PDF]?

This checklist is designed for Qualified Electrical Worker professionals in the general industry industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists