Aircraft Deicing and Anti-Icing Operations Checklist

This aircraft deicing and anti-icing operations checklist ensures compliance with FAA AC 120-60 (Ground Deicing and Anti-Icing Program), FAA-approved holdover time tables, ATA 100 aircraft deicing/anti-icing procedures, ISO 11076 aircraft ground deicing/anti-icing standards, and SAE Aerospace Standards for deicing fluids. Designed for deicing crew supervisors and airline ground operations personnel to conduct safe and effective aircraft deicing operations during winter weather conditions.

  • Industry: Aviation
  • Frequency: Per Event
  • Estimated Time: 20-45 minutes
  • Role: Deicing Crew Supervisor / Ground Operations Lead
  • Total Items: 30
  • Compliance: FAA AC 120-60 Ground Deicing and Anti-Icing Program, FAA-Approved Holdover Time Tables (current edition), ISO 11076 Aircraft Ground Deicing/Anti-Icing, SAE AMS 1424 Type I Deicing Fluid Standard, ATA 100 Aircraft Ground Deicing Procedures

Weather and Holdover Time

Meteorological conditions and HOT determination.

  • Current METAR and PIREP reviewed for precipitation type and rate?
  • Outside Air Temperature (OAT) measured and recorded?
  • Holdover Time (HOT) determined from FAA holdover time tables?
  • Deicing/anti-icing fluid type selected based on HOT needed?
  • HOT communicated to flight crew?

Fluid Preparation

Deicing fluid mix and quality.

  • Correct fluid type confirmed (Type I, II, III, IV)?
  • Fluid/water concentration correct for temperature (Type I: varies)?
  • Fluid heated to correct temperature per manufacturer specs?
  • Fluid not expired or contaminated?
  • Deicing vehicle and wand equipment ready and tested?

Deicing Procedure

Step 1 - Contamination removal.

  • All critical surfaces treated (wings, stabilizers, fuselage, control surfaces)?
  • Fluid not sprayed into engine intakes?
  • Pitot tube covers removed before deicing?
  • Static ports not obstructed by fluid accumulation?
  • Step 1 deicing complete - all contamination removed?

Anti-Icing Procedure

Step 2 - Protective coat application.

  • Step 2 anti-icing fluid applied to all critical surfaces?
  • Even coverage achieved (no dry or missed spots)?
  • Anti-icing fluid running off surfaces (not building up)?
  • Two-step deicing/anti-icing procedure completed?
  • HOT timer started at end of anti-icing (Step 2)?

Pre-Departure Clean Aircraft Concept

Final contamination-free check.

  • Visual check confirms aircraft wings and stabilizers clean?
  • Aircraft departing within HOT (not exceeded)?
  • Flight crew completed pre-takeoff contamination check?
  • No frozen fluid residue on control surfaces?
  • Anti-ice fluid not obstructing critical sensors?

Deicing Documentation

Deicing record keeping.

  • Deicing/anti-icing record completed (fluid type, dilution, HOT)?
  • Aircraft registration documented on deicing record?
  • Deicing crew names and certifications documented?
  • Deicing record provided to flight crew before departure?
  • Deicing Operations Notes

Related Aviation Checklists

Related Ground Operations Checklists

Why Use This Aircraft Deicing and Anti-Icing Operations Checklist?

This aircraft deicing and anti-icing operations checklist helps aviation teams maintain compliance and operational excellence. Designed for deicing crew supervisor / ground operations lead professionals, this checklist covers 30 critical inspection points across 6 sections. Recommended frequency: per event.

Ensures compliance with FAA AC 120-60 Ground Deicing and Anti-Icing Program, FAA-Approved Holdover Time Tables (current edition), ISO 11076 Aircraft Ground Deicing/Anti-Icing, SAE AMS 1424 Type I Deicing Fluid Standard, ATA 100 Aircraft Ground Deicing Procedures. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What is a Aircraft Deicing and Anti-Icing Operations Checklist?

A Aircraft Deicing and Anti-Icing Operations Checklist is a standardized inspection form used by deicing crew supervisor / ground operations lead to ensure consistent aviation operations. It contains 35 inspection points organized into 6 sections. FREE aircraft deicing anti-icing operations checklist PDF. FAA AC 120-60, FAA holdover time tables, ATA 100 deicing procedures, ISO/SAE standards compliance. 35+ deicing operations checks. Download FREE template now.

How often should I use this aviation checklist?

This checklist is designed to be completed per event. Regular use ensures compliance with FAA AC 120-60 Ground Deicing and Anti-Icing Program and FAA-Approved Holdover Time Tables (current edition) and helps identify issues before they become problems.

Can I download this Aircraft Deicing and Anti-Icing Operations Checklist as a PDF?

Yes, you can download this checklist as a FREE PDF for printing or offline use. The checklist includes 35 fields across 6 sections and typically takes 20-45 minutes to complete.

What compliance standards does this checklist cover?

This checklist helps ensure compliance with FAA AC 120-60 Ground Deicing and Anti-Icing Program, FAA-Approved Holdover Time Tables (current edition), ISO 11076 Aircraft Ground Deicing/Anti-Icing, SAE AMS 1424 Type I Deicing Fluid Standard, ATA 100 Aircraft Ground Deicing Procedures. Following these standards protects your organization and ensures best practices.

How do I complete this aviation inspection checklist?

Begin by completing the header fields for Airport, Date/Time (UTC), Deicing Crew Lead Name, Aircraft Type, and Precipitation Type. Work through each of the 6 sections, marking items Yes or No as applicable. Add notes for any issues found. The entire process takes approximately 20 to 45 minutes.

What are the key sections in this aviation checklist?

This aviation checklist is organized into 6 key sections: Weather and Holdover Time, Fluid Preparation, Deicing Procedure, Anti-Icing Procedure, Pre-Departure Clean Aircraft Concept, Deicing Documentation. Each section contains specific inspection points that deicing crew supervisor / ground operations lead must verify. The structured layout ensures nothing is missed during aviation inspections and makes the process efficient, typically taking 20-45 minutes to complete.

Who should use this Aircraft Deicing and Anti-Icing Operations Checklist?

This checklist is primarily designed for deicing crew supervisor / ground operations lead working in aviation operations. However, it is also valuable for quality assurance teams, safety officers, compliance managers, and supervisors who need to verify that aviation standards are being met. Organizations of all sizes can benefit from using this Aircraft Deicing and Anti-Icing Operations Checklist to maintain consistency and accountability.

Browse More Checklists

POPProbe