Aircraft Towing Post-Tow Verification Checklist

This aircraft towing post-tow verification checklist ensures compliance with airline Ground Operations Manual towing procedures, FAA aircraft ground handling requirements, and aircraft manufacturer maintenance manual towing procedures. Designed for crew chiefs and ramp supervisors to verify complete disconnection and aircraft safety after every towing operation.

  • Industry: Aviation
  • Frequency: Per Event
  • Estimated Time: 10-15 minutes
  • Role: Crew Chief / Ramp Supervisor
  • Total Items: 10
  • Compliance: Airline Ground Operations Manual Towing Procedures, FAA AC 150/5210-20 Ground Vehicle Operations, IATA Airport Handling Manual AHM 630, Aircraft Manufacturer Maintenance Manual Towing Section, OSHA 29 CFR 1910.178 Powered Industrial Trucks

Towbar Disconnection

Towbar and tow equipment removal.

  • Towbar disconnected from nose gear and aircraft?
  • Towbar removed and stowed?
  • Steering bypass pin removed (if installed)?
  • Parking brake set after tow?
  • Nose gear visually inspected after tow for damage?

Documentation

Tow documentation.

  • Towing log entry completed (aircraft, crew, route, time)?
  • Any damage discovered during tow reported immediately?
  • ATC/Ground Control notified of tow completion?
  • Aircraft parked in correct position per parking chart?
  • Towing Notes

Related Aviation Checklists

Related Ground Operations Checklists

Why Use This Aircraft Towing Post-Tow Verification Checklist?

This aircraft towing post-tow verification checklist helps aviation teams maintain compliance and operational excellence. Designed for crew chief / ramp supervisor professionals, this checklist covers 10 critical inspection points across 2 sections. Recommended frequency: per event.

Ensures compliance with Airline Ground Operations Manual Towing Procedures, FAA AC 150/5210-20 Ground Vehicle Operations, IATA Airport Handling Manual AHM 630, Aircraft Manufacturer Maintenance Manual Towing Section, OSHA 29 CFR 1910.178 Powered Industrial Trucks. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Aircraft Towing Post-Tow Verification Checklist cover?

This checklist covers 10 inspection items across 2 sections: Towbar Disconnection, Documentation. It is designed for aviation operations and compliance.

How often should this checklist be completed?

This checklist should be completed per event. Each completion takes approximately 10-15 minutes.

Who should use this Aircraft Towing Post-Tow Verification Checklist?

This checklist is designed for Crew Chief / Ramp Supervisor professionals in the aviation industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists