Electrical Safety Inspection Checklist
This electrical safety inspection checklist ensures compliance with OSHA electrical standards and NFPA 70E. Covers electrical panels, equipment, cords, grounding, arc flash labeling, and safe work practices.
- Industry: All Industries
- Frequency: Monthly / Quarterly
- Estimated Time: 45-60 minutes
- Role: Safety Officer / Maintenance Manager
- Total Items: 33
- Compliance: OSHA 29 CFR 1910 Subpart S, NFPA 70E (Electrical Safety in the Workplace), NFPA 70 (NEC)
Electrical Panels & Disconnects
Panel accessibility, labeling, and condition.
- 36" clearance maintained in front of all panels?
- Panels accessible (not blocked by storage)?
- All circuit breakers/fuses properly labeled?
- Panel covers installed and secured?
- No open knockouts in panels/boxes?
- Disconnects labeled for equipment served?
- Photo Documentation
Arc Flash Labels & PPE
NFPA 70E arc flash hazard requirements.
- Arc flash warning labels on all panels/equipment?
- Arc flash labels current (within study date)?
- Required PPE level indicated on labels?
- Arc-rated PPE available for workers?
- Approach boundaries marked/known?
Electrical Equipment & Outlets
Equipment condition and installation.
- All electrical equipment properly grounded?
- Outlets in good condition (no damage, heat marks)?
- All outlet/switch cover plates installed?
- Junction boxes covered and accessible?
- GFCIs installed in wet/damp locations?
- GFCIs tested and functional?
Cords, Cables & Extension Cords
Portable electrical equipment safety.
- Cords free of damage, fraying, or splices?
- Three-prong plugs intact (ground pin present)?
- Extension cords used temporarily only?
- No daisy-chained extension cords?
- Cords protected from physical damage?
- Cords not run through walls, ceilings, doors?
Electrical Lockout/Tagout
LOTO for electrical equipment.
- LOTO procedures exist for electrical work?
- LOTO devices available for breakers/disconnects?
- Only qualified personnel work on energized equipment?
- Voltage testing performed before work?
Lighting & Emergency Lighting
General and emergency lighting systems.
- Adequate lighting in all work areas?
- No burned-out bulbs or flickering fixtures?
- Emergency lighting operational?
- Exit signs illuminated and visible?
- Monthly 30-second test completed (documented)?
Related Manufacturing Checklists
- Slip, Trip, and Fall Prevention Checklist
- Workplace Housekeeping Inspection Checklist
- Emergency Evacuation Drill Checklist
- Manufacturing Lockout/Tagout (LOTO) Procedure Checklist
- Document Control Checklist
- Quality Assurance Inspection Checklist
- Equipment Maintenance Checklist
- Workplace Risk Assessment Checklist
Related Articles
Related Safety Compliance Checklists
- Lockout Tagout Verification - FREE Download
- Incoming Materials Inspection - FREE Download
- OSHA Fire Safety Inspection Checklist - FREE Download
- PPE Compliance Inspection Checklist - FREE Download
- OSHA General Industry Compliance Checklist - FREE Download
- Chemical Storage & SDS Audit Checklist - FREE Download
- Slip, Trip, and Fall Prevention Checklist - FREE Download
- Workplace Housekeeping Inspection Checklist - FREE Download
- Emergency Evacuation Drill Checklist - FREE Download
- Manufacturing Lockout/Tagout (LOTO) Procedure Checklist - FREE Download
Why Use This Electrical Safety Inspection Checklist?
This electrical safety inspection checklist helps all industries teams maintain compliance and operational excellence. Designed for safety officer / maintenance manager professionals, this checklist covers 33 critical inspection points across 6 sections. Recommended frequency: monthly / quarterly.
Ensures compliance with OSHA 29 CFR 1910 Subpart S, NFPA 70E (Electrical Safety in the Workplace), NFPA 70 (NEC). Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Electrical Safety Inspection Checklist cover?
This checklist covers 33 inspection items across 6 sections: Electrical Panels & Disconnects, Arc Flash Labels & PPE, Electrical Equipment & Outlets, Cords, Cables & Extension Cords, Electrical Lockout/Tagout, Lighting & Emergency Lighting. It is designed for all industries operations and compliance.
How often should this checklist be completed?
This checklist should be completed monthly / quarterly. Each completion takes approximately 45-60 minutes.
Who should use this Electrical Safety Inspection Checklist?
This checklist is designed for Safety Officer / Maintenance Manager professionals in the all industries industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.