IATA DGR Section 9 Class 3 Flammable Liquids Acceptance Checklist
Accepting Class 3 flammable liquids for air transport requires verification against IATA Dangerous Goods Regulations (DGR) Table 4.2 and the applicable packing instructions. Flammable liquids with a flash point at or below 60 degrees C are Class 3 hazardous materials; those with a flash point above 60 degrees C may be regulated as miscellaneous hazardous materials under certain conditions. Shippers must provide a completed Shipper's Declaration, and ground handling staff must verify all nine acc
- Industry: Transportation & Logistics
- Frequency: Quarterly
- Estimated Time: 20-30 minutes
- Role: Cargo Safety Manager
- Total Items: 20
- Compliance: IATA DGR, ICAO Technical Instructions, 49 CFR 175
Proper Shipping Name and Classification Verification
Confirm the shipper has used the correct UN number, proper shipping name, and packing group from IATA DGR Table 4.2.
- Proper shipping name matches one of the entries in IATA DGR Table 4.2 for the substance?
- UN number on package and Shipper's Declaration matches IATA DGR Table 4.2 entry?
- Packing group (I, II, or III) correctly identified based on flash point and initial boiling point?
- Substance is not forbidden for transport by air (not in Table 4.2 Forbidden column)?
Quantity Limits and Packing Instructions
Class 3 liquids have quantity limits per package based on packing group and passenger vs. cargo aircraft per IATA DGR packing instructions.
- Quantity per package does not exceed the packing instruction limit for passenger aircraft (if applicable)?
- Quantity per package does not exceed cargo aircraft limit (typically 60L for PG I/II, 220L for PG III)?
- Correct packing instruction number noted on declaration?
- Packing instruction and quantity limit used:
Packaging Compliance and Testing Standards
Packages must meet UN specification packaging requirements including drop, leakproofness, and hydrostatic pressure tests.
- Package marked with UN symbol, specification code, and packing group compatible with contents?
- Closure (cap, lid, or bung) properly secured; no evidence of leakage?
- Inner packaging (if combination package) cushioned with absorbent material?
- No evidence of previous leakage (staining, residue on exterior of package)?
Marking and Labeling Verification
Verify all required marks and labels are correctly applied to the outer package per IATA DGR Chapter 7.
- UN number in 12mm tall font on package (e.g., 'UN 1203' or 'UN1203')?
- Class 3 flammable liquid diamond label (red, flame symbol) affixed on two opposite sides?
- Shipper and consignee name and address on package?
- THIS WAY UP arrows on packages containing liquid inner packagings?
Shipper's Declaration and Acceptance Certification
Verify the Dangerous Goods Shipper's Declaration is complete and sign the acceptance check.
- Shipper's Declaration complete with all required fields (shipper, UN#, PSN, PG, quantity, PI, etc.)?
- Shipper's Declaration signed by qualified signatory (trained and authorized)?
- Shipment accepted per all applicable IATA DGR criteria?
- Acceptance checker signature and date:
Related Transport & Logistics Checklists
- IATA DGR Lithium Battery Shipment Compliance Checklist Section 4.2
- IATA DGR Dangerous Goods Shipper Declaration Verification Checklist
- IATA DGR Packaging & Marking Compliance Verification Checklist
- FAA 14 CFR Part 43 Maintenance Return to Service Record Checklist
- FAA 14 CFR Part 43 Appendix D Annual Inspection Scope Checklist
- FAA 14 CFR Part 135 Air Carrier Maintenance Program Audit Checklist
- FAA 14 CFR Part 145 Repair Station Quality System Audit Checklist
- ICAO Annex 14 Aerodrome Runway Safety Inspection Checklist
Related Fleet Management Checklists
- Daily Vehicle Pre-Trip Inspection - FREE Download
- CDL Pre-Trip Inspection Checklist - FREE Download
- Post-Trip Vehicle Condition Report - FREE Download
- Commercial Driver Pre-Trip Inspection - FREE Download
- Trailer Coupling Inspection - FREE Download
- Cold Chain Transport & Reefer Inspection Checklist [FREE PDF] - FREE Download
- Last-Mile Delivery Vehicle Safety Checklist [FREE PDF] - FREE Download
- Driver Hours of Service (HOS) Compliance Checklist [FREE PDF] - FREE Download
- DOT FMCSA 49 CFR 396.11 Class 3-5 Truck Pre-Trip DVIR Checklist - FREE Download
- DOT FMCSA 49 CFR 396.11 Class 7-8 Heavy-Duty Pre-Trip DVIR Checklist - FREE Download
Why Use This IATA DGR Section 9 Class 3 Flammable Liquids Acceptance Checklist?
This iata dgr section 9 class 3 flammable liquids acceptance checklist helps transportation & logistics teams maintain compliance and operational excellence. Designed for cargo safety manager professionals, this checklist covers 20 critical inspection points across 5 sections. Recommended frequency: quarterly.
Ensures compliance with IATA DGR, ICAO Technical Instructions, 49 CFR 175. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the IATA DGR Section 9 Class 3 Flammable Liquids Acceptance Checklist cover?
This checklist covers 20 inspection items across 5 sections: Proper Shipping Name and Classification Verification, Quantity Limits and Packing Instructions, Packaging Compliance and Testing Standards, Marking and Labeling Verification, Shipper's Declaration and Acceptance Certification. It is designed for transportation & logistics operations and compliance.
How often should this checklist be completed?
This checklist should be completed quarterly. Each completion takes approximately 20-30 minutes.
Who should use this IATA DGR Section 9 Class 3 Flammable Liquids Acceptance Checklist?
This checklist is designed for Cargo Safety Manager professionals in the transportation & logistics industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.