SOLAS Chapter III Life Raft Monthly Inspection Checklist
Under SOLAS Chapter III Regulation 20.8, a competent person (typically the ship's safety officer or certificated crew) must inspect liferafts monthly to verify the HRU is within service date, the container is undamaged, the painter line is properly connected, and the stowage cradle permits free float-free release. The monthly inspection does not replace the annual shore-based service performed by an approved service station, but it ensures the raft is ready for immediate deployment. Vessels fail
- Industry: Transportation & Logistics
- Frequency: Monthly
- Estimated Time: 20-30 minutes
- Role: Chief Officer
- Total Items: 19
- Compliance: SOLAS 1974 as amended, IMO Resolution MSC, ISM Code
Container Condition and Stowage
Inspect the fiberglass or metal container for damage, UV degradation, and secure stowage on the cradle per SOLAS III/20.
- Container free of cracks, punctures, or deformation affecting watertight integrity?
- Container securing straps/bands intact and not corroded at buckle?
- Container positioned in cradle with painter line routed correctly to raft stowage point?
- Container weight (capacity) placard readable and matches class certificate?
Hydrostatic Release Unit (HRU) and Float-Free Arrangement
The HRU allows float-free deployment when the vessel sinks. Verify HRU service date and correct installation per SOLAS III/20.8.2.
- HRU service expiry date has not passed (check markings on HRU body)?
- HRU correctly installed in cradle with weak link connecting painter to ship fixed point?
- Weak link rated at 2.2 kN (as required by SOLAS LSA Code for HRU)?
- HRU service date (from marking on device):
Painter Line and Activation System
The painter line connects the raft container to the vessel and triggers CO2 inflation during float-free release.
- Painter line free of fraying, cuts, or UV damage for full visible length?
- Painter line properly connected at vessel-side securing point (not fouled or knotted)?
- Sufficient painter line slack to allow raft to drift away from sinking vessel before inflation?
Annual Service Status and Maintenance Record
Verify the liferaft is within its annual service date and the service report from an approved service station is on board.
- Annual shore-based service date has not expired (check service label on container)?
- Service station report from most recent annual service on file aboard vessel?
- Annual service date (from container label):
- Raft identification number and location on vessel:
Monthly Inspection Certification
Record the monthly inspection completion per SOLAS III/20.8 and ship's SMS procedures.
- All liferafts on this side (port/starboard) inspected this month?
- Any deficiencies found (describe or None):
- Vessel name and IMO number:
- Safety officer signature and inspection date:
Related Transport & Logistics Checklists
- SOLAS Chapter III EPIRB & SART Annual Inspection Checklist
- SOLAS Chapter III Abandon Ship Drill Documentation Checklist
- SOLAS Chapter V Bridge Equipment & Navigation Aids Inspection
- SOLAS Chapter V GMDSS Equipment Inspection & Test Checklist
- SOLAS Chapter IX International Safety Management ISM Code Audit
- SOLAS Chapter XI-2 ISPS Code Ship Security Plan Audit Checklist
- IMO MARPOL Annex I Oil Record Book - Machinery Space Operations
- IMO MARPOL Annex VI Air Emissions NOx/SOx Monitoring Checklist
Related Fleet Management Checklists
- Daily Vehicle Pre-Trip Inspection - FREE Download
- CDL Pre-Trip Inspection Checklist - FREE Download
- Post-Trip Vehicle Condition Report - FREE Download
- Commercial Driver Pre-Trip Inspection - FREE Download
- Trailer Coupling Inspection - FREE Download
- Cold Chain Transport & Reefer Inspection Checklist [FREE PDF] - FREE Download
- Last-Mile Delivery Vehicle Safety Checklist [FREE PDF] - FREE Download
- Driver Hours of Service (HOS) Compliance Checklist [FREE PDF] - FREE Download
- DOT FMCSA 49 CFR 396.11 Class 3-5 Truck Pre-Trip DVIR Checklist - FREE Download
- DOT FMCSA 49 CFR 396.11 Class 7-8 Heavy-Duty Pre-Trip DVIR Checklist - FREE Download
Why Use This SOLAS Chapter III Life Raft Monthly Inspection Checklist?
This solas chapter iii life raft monthly inspection checklist helps transportation & logistics teams maintain compliance and operational excellence. Designed for chief officer professionals, this checklist covers 19 critical inspection points across 5 sections. Recommended frequency: monthly.
Ensures compliance with SOLAS 1974 as amended, IMO Resolution MSC, ISM Code. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the SOLAS Chapter III Life Raft Monthly Inspection Checklist cover?
This checklist covers 19 inspection items across 5 sections: Container Condition and Stowage, Hydrostatic Release Unit (HRU) and Float-Free Arrangement, Painter Line and Activation System, Annual Service Status and Maintenance Record, Monthly Inspection Certification. It is designed for transportation & logistics operations and compliance.
How often should this checklist be completed?
This checklist should be completed monthly. Each completion takes approximately 20-30 minutes.
Who should use this SOLAS Chapter III Life Raft Monthly Inspection Checklist?
This checklist is designed for Chief Officer professionals in the transportation & logistics industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.